60
A90B 68
.v.^ r.K*/'
^ ^
j' V \
^sV
■k,,iJ,/:-.v^„r.
•.r
■ U: -^■■-
l'»^\lis. fy' '.'4.1
^<f *' '5 '>'
^'if: ;•:
'■VT)
^"» 4mt ¥/'^' ! !^?*; , ' ,
' r,' ^
PROCEEDINGS OF THE
AMERICAN RAILWAY ENGINEERING
ASSOCIATION
(Engineering Division, Association of American Railroads)
CONTENTS, VOLUME 68
(For detailed index, see Bulletin 607, page 677)
Page Bulletin 601, September-October 1966
Barkley Dam Relocation — Illinois Central Railroad 1
Termite Control Investigation — Inspection of Specimens After 100 Months
of Service 13
Field Investigation of Longitudinal Forces in a Concrete Trestle on the
Santa Fe Railway 37
Some Observations on Russian Railroad Practices 103
Bulletin 602, November 1966 (Reports of Committees)
16 — Economics of Railway Location and Operation 109
13 — Water, Oil and Sanitation Services 125
9— Highways 137
14 — Yards and Terminals 155
20 — Contract Forms 169
3 — Ties and Wood Preservation 181
Bulletin 603, December 1966 (Reports of Committees)
25 — Waterways and Harbors 189
28 — Clearances 199
11 — Engineering and Valuation Records 203
18— Electricity 219
27 — Maintenance of Way Work Equipment 253
24 — Cooperative Relations with Universities 263
22 — Economics of Railway Labor 275
Bulletin 604, January 1967 (Reports of Committees)
6— Buildings 293
30 — Impact and Bridge Stresses 307
8— Masonry 311
7— Wood Bridges and Tresdes 343
15 — Iron and Steel Structures 349
Bulletin 605, February 1967 ( Reports of Committees )
5— Track 355
31— Continuous Welded Rail 367
4— Rail 405
1 — Roadway and Ballast 489
Bulletin 607, June-July 1967
Report of the 66th Annual Convention 531
Memoir, Charles J. Code 640
Report of Executive Secretary 643
Report of Treasurer 660
Constitution 662
Tie Renewals and Cost per Mile of Maintained Track 675
Index of Proceedings, Vol. 68, 1967 677
American Railway
Engineering Association^Bulletin
Bulletin 601 September-October 1966
Proceedings Vol. 68*
CONTENTS
Barkley Dam Relocation — Illinois Central Railroad 1
Termite Control Investigation — Inspection of Specimens
After 100 Months of Service 13
Field Investigation of Longitudinal Forces in a Concrete
Trestle on the Santa Fe Railway 37
Some Observations on Russian Railroad Practices 103
*The contents of this Bulletin and subsequent Bulletins of the Association to and including Bulletin 607, June-July 1967 (except Bulletin 606, March 1967), will constitute the Annual Proceedings of the Association, Vol. 68. Accordingly, this issue of the Bulletin should be carefully preserved for inclusion in the Pro- ceedings book-type binder which will be made available on request from the secretary's office, following publication of the June-July issue.
Copyright 1966, by American Rqilwoy Engineering Astotiation
American Railway
Engineering Association— Bulletin
Bulletin 601 Proceedings Vol. 68*
September-October 1966
CONTENTS
Berkley Dam Relocation — Illinois Central Railroad 1
Termite Control Investigation — Inspection of Specimens
After 100 Months of Service 13
Field Investigation of Longitudinal Forces in a Concrete
Trestle on the Santa Fe Railway 37
Some Observations on Russian Railroad Practices 103
* The contents of this Bulletin and subsequent Bulletins of the Association to and including BuUetin 607, June-July 1967 (except Bulletin 606, March 1967), will constitute the Annual Proceedings of the Association, Vol. 68. Accordingly, this issue of the Bulletin should be carefully preserved for inclusion in the Pro- ceedings book-type binder which will be made available on request from the secretary's office, following publication of the June-July issue.
Copyright 1966, by American Railway Engineering Association
BOARD OF DIRECTION 1966-1967
President J. M. Trissal, Vice President, Illinois Central Railroad, Chicago, HI. 60605
Vice Presidents T. B. HUTCHESON, Chief Engineer, Seaboard Air Line Railroad, Richmond, Va. 23213 H. E. Wilson, Assistant Chief Engineer — System, Atchison, Topeka & Santa Fe Rail- way, Chicago, 111. 60604
Past Presidents T. F. BuRRis, Retired General Manager, Construction and Maintenance of Way, Chesa- peake & Ohio Railway — Baltimore & Ohio Railroad, Huntington, W. Va. A. V. Johnston, Chief Engineer, Canadian National Railways, Montreal 3, Que.
Directors D. C. Hastings, Vice President — Operations, Atlantic Coast Line Railroad, Jacksonville,
Fla. 32202 J. S, Parsons, Engineering Consultant, Erie Lackawanna Railroad, Cleveland, Ohio
44115 S. H. PooRE, Office Engineer, Chesapeake & Ohio Railway — Baltimore & Ohio Railroad,
Huntington, W. Va. 25718
F. N. Beighley, Roadway Engineer, St. Louis-San Francisco Railway, Springfield, Mo.
65802
D. H. Shoemaker, Chief Engineer, Northern Pacific Railway, St. Paul, Minn. 55101 M. S. Reid, Assistant Chief Engineer — Maintenance, Chicago & North Western Railway,
Chicago, 111. 60606 J. B. Clark, Chief Engineer, Louisville & Nashville Railroad, Louisville, Ky. 40201 J. A. Rust, Senior Assistant Chief Engineer, Southern Railway System, Atlanta, Ga.
30303
G. V. Guerin, Chief Engineer, Great Northern Railway, St. Paul, Minn. 55101
C. Nexjteld, Assistant Chief Engineer, Canadian Pacific Railway, Montreal 3, Que.
H. W. Kellogg, Regional Assistant Chief Engineer, Chesapeake & Ohio Railway — Balti- more & Ohio Railroad, Richmond, Va. 23210
F. H. McGxncAN, Assistant Engineer of Structures, Missouri Pacific Railroad, St. Louis, Mo. 63103
Treasurer A. B. Hn-LMAN, Jr., Chief Engineer, Belt Railway of Chicago, Chicago, 111. 60638
Executive Secretary Earl W. Hodgkins, 59 East Van Buren Street, Chicago, III. 60605
Assistant Secretary
E. G. Gehrke, 59 East Van Buren Street, Chicago, III. 60605
Published by the American Railway Engineering Association, Monthly, January, February, March,
November and December; Bi-Monthly, June- July, and September-October, at
59 East Van Buren Street, Chicago, 111. 60605
Second class postage paid at Chicago, 111., and at additional mailing offices. Subscription $10 per annum.
Advance Report of Committee 16 — Economics of Railway Location
and Operation
Report on Assignment 6
Features of Economic and Engineering Interest in the Study, Design, Construction and Operation of New Railway Line Projects, or Major Line Reloca- tions, Proposed, In Progress or Recently Completed
H. L. Woldridge (chairman, subcommittee), R. C. Gilbert, S. B. Gill, R. A. Hartselle, G. E. Hartsoe, G. A. Jacob, R. J. Lane, H. A. Lind, R. McCann, D. McCorquo- dale, T. C. Nordquist, W. B. Peterson, G. S. Sowers, W. S. Tuinstra, P. E. Van Cleve.
Barkley Dam Relocation — Illinois Central Railroad
By W. W. ARNETT
Project Engineer, Illinois Central Railroad
INTRODUCTION
The River and Harbor Act, 1954, 68 Statute 1248, included authorization for the construction of Barkley Dam on the Cumberland River near Grand Rivers, Ky. The authorization provided for a multipurpose project for navigation, flood control and hydroelectric power, consisting of a high dam, lock and power plant at Mile 30.5 on the lower Cumberland River and a canal connecting the proposed reservoir with a reservoir at Kentucky Dam on the Tennessee River.
Barkley Reservoir as proposed under the River and Harbor Act of 1954 required the relocation of all Illinois Central Railroad facilities from a point 2 miles west of the Cumberland River to a point 10 miles east of this river. The project was estimated to cost $145,000,000, which included $6,920,OOa for changes in Illinois Central facilities.
GENERAL
The general topography of the terrain traversed by relocated railroad facilities is rolling to hilly and the entire area, except a portion west of the Cumberland River, is above the maximum reservoir elevation. The geological formation west of the Cumber- land River is principally reddish white clay and gravel, and the materials encountered east of the river for the most part consist of reddish clay and gravel with some cherty material.
Due to the rolling terrain, numerous ascending and descending grades were neces- sary in order to approximately balance the cut and fill quantities, although the gradient of the relocated track rises from a sea level datum elevation of approximately 385 near the west end of the project to an elevation of 567 near the east end of the relocation.
1 Bui. 601
Barklej' Dam Relocat i o n
|
d |
z |
|
o |
o |
|
o |
»— |
|
< |
< |
|
o |
o |
|
_J |
o |
|
< |
LiJ |
|
cr |
CC |
|
_i |
|
|
< |
2 |
|
1— |
< |
|
Z |
o |
|
UJ |
|
|
o |
>- |
|
CO |
LiJ —1 |
|
o |
^ |
|
z |
CC |
|
-I |
< |
|
_l |
CD |
Barkley Dam Relocation
A maximum grade of 0.5 percent was used throughout the relocated facility with the exception of a 9200-ft section immediately east of Barkley Dam. The railroad elected to use a 0.7-percent grade ascending eastward at this location to avoid excessive grading. Since all eastbound train tonnage is lighter than westbound movements, the use of a 0.7-percent grade does not affect the ruling or maximum grade on the operating district.
The relocated main track, which crosses the Cumberland River on a concrete and steel bridge supported on Barkley Dam, is a single main with the exception of 10,000 ft of second main immediately east of the river.
The main track has seven horizontal curves with a total curvature of 213 deg 56 min. The minimum degree of curve is 0 deg 30 min and the maximum, 4 deg 00 min. The maximum curve is near the west end of the project and was necessary in order to route the main track across Barkley Dam, which is approximately one mile downstream from the existing Cumberland River railroad bridge.
It was necessary to estabUsh 4 public grade crossings and 25 private grade crossings along the relocated tracks. Also, 8 grade separations were constructed involving various federal, state and county highways.
Only two industries were affected by the relocation, one of which was abandoned because of inundation of farm land by Barkley Reservoir, but it was necessary to relocate facihties serving a rail-to-water, coal-transfer terminal.
The coal-transfer facility, located on Kentucky Lake, began operation in 1952 and has a capacity for transferring approximately 300 railroad cars of coal daily direct to river barges. The facilities consist of lead tracks, load yard, empty yard and bridge where coal is dumped into barges.
Prior to the beginning of relocation, the existing tracks served the towns of Kut- tawa, Eddyville and Grand Rivers in Kentucky. Since the relocated route by-passed Kuttawa and Eddyville, the freight depot at Eddyville was relocated to a new site, which was designated Fairview, Ky. The freight agency at Kuttawa was closed during the construction account of decHne in business, and the facility at Grand Rivers was moved to a new site adjacent to the relocated tracks.
The completed, relocated track facilities consist of 16.3 miles of main track and 1.9 miles of second main, totaling 18.2 miles. An existing siding known as Gravel Switch was extended 1 mile to provide a siding 1.8 miles long west of the Cumberland River, and two business tracks, one 0.2 mile and the other 0.5 mile in length, were provided at Grand Rivers and Fairview, respectively.
The relocated tracks to serve the coal-transfer facility consist of two lead tracks, a storage track, a crossover and a wye track, totaling 4.6 track miles.
PRELIMINARY PLANNING
Due to the extremely tight schedule, in August 1960 the railroad began assembling engineering personnel from various divisions and employing additional personnel as available. In addition, two survey parties were furnished by a private engineering firm. In all as many as 22 field engineering personnel were engaged in this phase of the work at the time of peak employment.
It was necessary for the railroad to negotiate with and enter into agreements with various owning agencies covering relocation of utility c()mpan>' facilities and state and county highways affected by the track relocation.
Although numerous minor revisions in plans and related data continued until the construction contract was awarded, final plans, estimates and specifications for reloca-
Barkley Dam Relocation
tion of the railroad west of the Cumberland River along the original survey and reloca- tion of the railroad along line "C" east of the Cumberland River were submitted to the U. S. Corps of Engineers on January 30, 1961. The final plans involved approximately 18.2 miles of main track and approximately 6.4 miles of siding and other tracks, includ- ing approximately 4.6 miles of trackage to serve the coal transfer facility. The total cost of work, for contractural purposes, was estimated to be approximately $6,000,000. Approximately 5 miles of second main track were eliminated under the final plan. The railroad agreed to eliminating the five miles of second main on the basis that the Corps of Engineers approved the extension of relocated centralized traffic control facilities to the east end of the project, a distance of approximately 8 miles, at the Corps' expense.
It was necessary to write a complete set of technical specifications covering all aspects of the work. All design work was performed by Illinois Central forces with the exception of grade separation structures which were designed by a consultant under the supervision of the IC engineer of bridges.
In general, it can be said the final design and specifications for the relocated facil- ities were a composite of information based on standard practice, railroad standards, AREA recommended practice, and state and federal standards. Every effort was made to obtain the most desirable facility in regard to economics and operating features, inso- far as possible within the terms of the contract with the Corps of Engineers, particular consideration being given to the provisions of the contract governing reimbursement and betterments.
SUMMARY OF CONSTRUCTION CONTRACT
The construction contract, with certain stipulations, obligated the railroad company to undertake, on a cost-reimbursable basis, relocation and adjustment of its facilities, together with certain modifications and relocations of roads and utility lines affected by the railroad relocation, excepting the construction of a bridge across the lock, dam and powerhouse structures and certain portions of the embankment which were considered a part of the Barkley Dam structure.
The railroad company agreed to use materials and equipment from its existing facilities insofar as practical and economical, it being understood that use of such mate- rials and equipment was limited due to the necessity of completing and placing in serv- ice the relocated tracks prior to discontinuance of service on the existing facilities.
The railroad company agreed to furnish from its ownership, without rental, rail, joint bars, tie plates and turnouts for all relocated tracks other than main-line tracks and connecting turnouts, it being understood and agreed that all such rail, joint bars, tie plates and turnouts would be replaced to the company in an equal amount of rail, joint bars, and tie plates in tons, and an equal number of turnouts from the existing railroad on or before completion of project.
The contract provided that the railroad company procure and install relay rail, joint bars, and tie plates required for main tracks and connecting turnouts in the facil- ities to be relocated, and that these materials were to be comparable to materials in the existing facilities. The contract further provided that in the event the railroad company could not obtain comparable material from its own ownership or from other sources after a reasonable effort to do so, the company could procure and install new llS-lb rail, joint bars and tie plates for the main tracks and connecting turnouts with the full cost of the new material to be borne by the United States Government.
The contract provided that all salvable materials from the existing facilities which were not utilized in the relocated facilities would be removed and delivered to the United
Barkley Da m Relocation
States Government, or otherwise disposed of as directed by the contracting officer, except- ing items to be retained by the railroad company as a replacement for loaned materials. The manner and extent of removal and disposal of all salvable materials and equipment to be mutually determined by the railroad company and the Corps of Engineers at a later date.
Under the terms of the contract 14 turnouts and approximately 5 track, miles of rail, together with appurtenances, were loaned to the Government. New cross ties, switch ties and small track fittings were acquired and installed at the expense of the Government.
The railroad company agreed to undertake deferred construction for a period of five years after the date operations started on the relocated facility, on a cost-reimburs- able basis, it being understood that deferred construction meant work involved after completion of the relocation, over and above ordinary maintenance and necessary to stabilize the relocated facilities, to afford the railroad company replacement facilities equal in service and utility to the existing facility being relocated.
On completion of the railroad relocation, the railroad company agreed to quitclaim and convey to the Government, subject to certain stipulations, all of its rights, title, and interest in lands and remaining facilities of the existing railroad which was to be relocated and abandoned and satisfy all taxes due and payable or which constitute a lien upon the property at the time of conveyance.
Under the terms of the contract, the Government agreed to reimburse the railroad company for all cost expended in connection with the relocation of its facilities, such cost to include all items of expense properly chargeable thereto including, but not limited to, labor, materials, transportation, insurance, overhead, supervision, permits, taxes, rental of tools, equipment and machinery employed in the work, together with such other items of expense as should, in the opinion of the Government contracting officer, be included in the cost of work. It was mutually agreed that billing would be issued on a GMA basis.
The Government agreed to procure all necessary right-of-way for relocating the railroad company's facilities and state and county roads. In this connection, the Gov- ernment agreed to furnish unencumbered title to all right-of-way lands for track relo- cation east of the Cumberland River and outside the limits of Barkley Dam proper. The remainder of the right-of-way is to be conveyed by perpetual easement.
Under terms of the contract, the railroad company agreed that the relocation would provide the railroad company with facilities equal in service and utility to those exist- ing, and that any improvement in design, construction or capacity over and above what was required to provide facilities of equal service and utility would constitute a better- ment and would be furnished by the company at its own cost and expense.
CONSTRUCTION BY CONTRACTOR General
Contract DA-40-058-CIVENG-62-1 between the Illinois Central Railroad and United States of America obligated the railroad company to perform the work of relo- cating its trackage affected by Barkley Reservoir; however, it was obvious that the railroad company did not have the personnel and/or equipment available to perform the work. For this reason and considering the scheduled completion date, the company elected to subcontract construction of the roadbed and appurtenances thereto.
The principal items of work involved were 2,064,717 cu yd of roadway and borrow excavation, 99,262 tons of crushed stone sub-ballast, 39,864 tons of rip-rap, 7,720 cu yd
Barkley Dam Relocation
of reinforced concrete, 754,017 lb of reinforcing steel, 1,104,873 lb of structural steel and 9,814 lin ft of culvert pipe of various sizes and types.
The original contractural proposal contained 87 separate bid items, but as construc- tion progressed it was necessary to supplement the agreement with the general contractor to include five additional pay items. The total amount paid the general contractor for contract work was $2,463,497.90, which was only $9,000 less than the original engineering estimate.
All work performed under contract with the general contractor was completed and formally accepted in November 1963.
Grading
The earth work for relocation of track and roads on the project was performed by two subcontractors; one subcontractor performed the work west of the Cumberland River and the second subcontractor performed all the work east of the river.
The minimum width of the railroad roadbed, not including rip-rap, for single track on embankments was 24 ft for main track and 22 ft for industrial track serving the Badgett rail-to-river terminal. The minimum width at subgrade for single track in cuts, including ditches, was Z2 ft. For each additional main track or siding the width of roadbed was increased 15 ft and for other additional tracks the increase in width of roadbed varied from 14 to 16 ft.
The minimum cut width of 32 ft provides a roadbed width of 12 ft and a ditch area 4 ft in width on each side of the center line.
The slope of embankments west of the Cumberland River was 2% to 1 and the excavation slope was V% to 1 except for a short stretch of main track which was above maximum reservoir elevation. The slope of embankments for railroad roadbed east of the Cumberland River was T^ to 1 and the slope in excavation was 1% to 1. The lY^- to-1 excavation slope was considered to be approximately the same as slopes in cuts along existing railroad to be relocated. The specifications provided for a >2-to-l slope in rock cuts; however, a very small percentage of the excavated material was rock.
The major portion of the construction work west of the Cumberland River was in the Barkley Reservoir area, and the embankments there were constructed on 2'J^ to 1 slopes to reduce the possibility of erosion and/or slippage. Also, the excavated materials from the cuts west of the Cumberland River were insufficient to construct embank- ments, so the cuts were widened and the slopes flattened to obtain additional fill mate- rial. Other fill material was obtained from designated borrow areas near the construc- tion site.
The embankments were constructed with materials excavated from roadbed and borrow areas, and compaction was obtained by using tractor-drawn sheep-foot rollers, each layer of fill material being compacted until the field density was an average of not less than 95 percent of the maximum density as determined by the Proctor method. Special attention was given to backfilling and placing of fill material adjacent to structures.
Prior to establishing the cut and fill slope ratios, numerous soil samples were ob- tained and tested in the laboratory of the Association of American Railroads at Chicago. Subsequent to a study of the soil samples, a representative of the AAR recommended design criteria for establishing widths of roadbed and fill and cut slope ratios. The final design followed the AAR recommendations very closely with the exception of the area east of the Cumberland River which is entirely above Barkley Reservoir. In this area the AAR representative recommended providing a berm 12 to 15 ft wide on the slopes
Barklev Dam Relocation
of the deeper cuts. It was felt that this type of construction might be construed as a betterment; therefore, in lieu of berms, the cuts whose depth exceeded 20 ft were widened 5 ft on each side of the center line.
The roadbed widths and cut and fill slope ratios for all relocated county roads and highways were in accordance with the requirements of the owning agencies for each class and type of road.
Rip-Rap
The embankment slopes west of the Cumberland River, which are in the reservoir area, were protected with a 2 -ft blanket of rip-rap extending from natural ground to elevation .572 which is 3 ft below the highest elevation of Barkley Dam spillway gates. The rip-rap was trucked from a nearby quarry, dumped on fill slopes, and placed with a bulldozer. The action of the bulldozer in passing over the rip-rap partially embedded the material in the new fill slopes, and a sHght over-run in quantity was necessary in order to obtain a uniform cover not less than 2 ft thick, measured normal to the embankment slope.
Sub-Ballast
Prior to the construction of track, the entire roadbed was covered with a layer of sub-ballast 8 in thick under all tracks with the exception of the industrial tracks serving the Badgett rail-to-river coal terminal, where sub-ballast was placed to a depth of 6 in on the roadbed. The 8-in depth of sub-ballast was placed in layers of 4 in and the 6-in depth was placed in one layer, although better results could be obtained by placing the 6-in sub -ballast in two 3 -in layers.
The sub-ballast consisted of crushed limestone conforming to current ASTM specifications, D 1241, Type 1, Gradation C. Water was added to the sub-ballast mate- rial at the quarry and during placement as the specifications did not require use of a pug-mill. The specifications provided for compaction of sub-ballast with a suitable roller until the field density of each layer was an average of not less than 95 percent of the maximum density as determined by the method of tests for moisture-density rela- tions of soils, ASTM designation D 698. The specified density was converted to percent of solid volume and the latter method used in order to expedite field testing.
The railroad company elected to use sub-ballast for finishing the subgrade in lieu of constructing the upper portion of the roadbed with selected materials, as the prox- imity of two large stone quarries made this type of construction economically feasible.
Drainage Structures
Reinforced concrete culvert pipe was used under the railroad roadbed at waterway crossings where the completed structures were above the minimum pool elevation of 354 unless the required waterway opening was of sufficient size to prohibit use of pipe culverts. All drainage structures below the minimum pool elevation were reinforced concrete box culverts. Numerous types and sizes of concrete pipe culverts and corru- gated metal pipe culverts were used under the relocated county roads and highways.
Bridge Structures
A total of eight grade separation structures were constructed in connection with the track relocation project, consisting of one timber and steel structure, six concrete and steel structures, and one concrete structure. The length of bridges varied from approximately 41 ft to approximately 326 ft.
Barkley Dam Relocation
All railroad bridge structures were designed to AREA 1960 specifications using Cooper E 72 loading, with steam impact; the structural steel conformed to the AREA 1960 specifications. The overhead highway bridges were designed to conform to the AASHO 1957 specifications with loading ranging from H 15-44 to H 20-44. The struc- tural steel used in the overhead highway bridges conformed to the AREA 1960 specifications.
Due to the varying soil conditions at each bridge site, several types of foundation were used. One railroad bridge was constructed on footings supported on steel bearing piling, two railroad bridges were constructed on spread footings and at the fourth rail- road bridge site the footings were constructed on creosoted-timber bearing piling.
One overhead highway bridge was constructed with piers on spread footing and 14-in square reinforced concrete bearing piling under the abutments; one overhead high- way bridge was constructed with the piers and abutments on 14-in square reinforced concrete bearing piling and one overhead highway bridge was constructed with the abutments on steel bearing piling and the pier foundations resting on sohd rock. The fourth overhead highway bridge was of timber and steel construction with framed tim- ber piling bents placed on concrete pedestals. The timber and steel bridge was originally designed with pile bents, but due to soil conditions the plans were revised during con- struction and concrete pedestals were used in lieu of driven piling.
The subcontractor used a diesel hammer for driving the major portion of the piling on the project. While this type of hammer is economical to operate, it is felt a steam- or air-operated hammer gives much better results, particularly where piling are being driven to designated bearing values rather than to refusal.
CONSTRUCTION BY ILLINOIS CENTRAL FORCES Engineering
The resident personnel of the engineering force consisted of a project engineer, resi- dent engineer, masonry inspector, project accountant and numerous instrumentmen, rodmen and chainmen.
Approximately six months after beginning the construction work, two-way radio communication was established on the project. Four mobile radio units and one base station were furnished on a lease basis and the benefits from the installation were excel- lent. The use of radio communication not only resulted in closer supervision of the project, but also provided a more efficient operation thereby eliminating the need for a minimum of two additional employees and vehicles.
Track Structure
All main tracks and connecting turnouts were constructed with new llS-lb rail, and the side tracks and spur tracks were constructed with 90-lb and 112-lb second- hand rail.
Cross ties and switch ties were of good-grade oak timber, treated and graded in accordance with Illinois Central standards and specifications. The switch ties were sized, 7 in thick by 9 in wide, and furnished in lengths to conform with the company's turn- out standards. The cross ties used in main track construction were 7 in thick by 9 in wide by 8 ft 6 in long, adzed and bored in accordance with the railroad's standards and specifications. The cross ties used in the construction of sidings and other tracks were 6 in thick by 8 in wide by 8 ft long, adzed and bored in accordance with the railroad's
Barkley Dam Relocation
standards and specifications. The cross ties in main tracks, sidings and other tracks were spaced 20 in center to center to conform with the railroad standard.
Double-shoulder tie plates were used and abrasion plates with tie pads were used under all insulated joints in accordance with the railroad's standards. Under main track construction the tie plates were doweled gage width to the cross ties at the treating plant and the cross ties were shipped to the job site in bundles for easier handling and distribution.
The ballast used on all main tracks and sidings was slag and the ballast used on all business tracks and the coal transfer facility tracks was crushed limestone. The ballast was placed in accordance with Illinois Central's standards to a minimum depth of 12 in below the bottoms of the cross ties. The ballast sections were shaped to conform with the railroad standard drawing 18.01, single track, and standard drawing 18.01 A, double track. The ballast consisted of Illinois Central No. 3 standard slag and crushed lime- stone, graded uniformally in accordance with railroad specifications. The gradation for Illinois Central standard No. 3 ballast is the equivalent of AREA No. 4 ballast.
The crushed-stone ballast was obtained from a crushed-stone company at Grand Rivers, Ky., and another stone company at Olaton, Ky. The slag ballast was purchased from suppliers at Gary, Ind., and Birmingham, Ala.
Subsequent to execution of the construction contract, it was decided to build the main tracks with welded rail in lieu of conventional rail. It was necessary to secure approval of welded rail construction and the Corps of Engineers finally agreed to the change provided the cost of welding joints did not exceed $9.00 per joint. The rail was welded at the railroad company's system welding plant at Centralia, 111., and shipped to the project on trains consisting of 30 cars, each train having a capacity of approx- imately 4 track miles. The maximum length of each string of welded rail was 1440 ft, with shorter rails being used to adjust for signal and turnout locations.
The capacity of the system welding plant is approximately six track miles of rail each two weeks. It was necessary for the welding plant to furnish rail for system main- tenance as well as the Barkley Dam track relocation and since the track laying averaged approximately one track mile daily, there was occasionally a time lag between receipt of rail trains at the project. This did not present a problem as the interim was utilized to complete related work that could not be progressed during the track-laying opera- tion. The Illinois Central has utilized welded rail in its main tracks at various locations for a number of years but the Barkley Dam track relocation project was the initial use of welded rail in construction on a new roadbed; consequently, the track laying procedure was carefully planned several months in advance of construction.
Track Laying
The railroad company began assembling men and equipment for track laying in July 1963 when one extra gang foreman and approximately IS laborers were employed. Another gang consisting of approximately 15 men and a foreman was organized in August 1963. A few furloughed and/or experienced men were placed in service but the majority of the track laying personnel were inexperienced. One general foreman, special, was transferred to the project as general forman in charge of the track laying operation.
A speedswing was used to remove the welded rail from the train and special 24-in axle extensions were installed on both sides of the machine to provide tread clearance outside the ends of the cross ties. The extensions permitted the machine to maneuver without disturbing the pre-plated cross ties which were spaced to the required 20-in centers ahead of rail laying.
10 BarkleyDamRelocation
The cross ties, rail anchors, and other small fittings were trucked to the new roadbed and distributed ahead of the rail laying. Prior to removal of each pair of rails from the train, manufactured rollers were placed at gage width on the cross ties, resting on lie plates, at intervals of 40 or 50 ft to support the rails while they were being pulled from the train. Threader assemblies were installed on the end car of the rail train so that the rails were pulled from the train at gage width, permitting the rails to drop in place on the double-shoulder tie plates without additional handling when the rollers were removed.
Immediately following removal of the rollers and seating each pair of rails ahead of the train, every fourth tie was spiked with pneumatic hand spikers and the rail train was moved in position for the next pull. Tightening of jcints, solid spiking and applica- tion of rail anchors followed closely behind this operation so that at the end of each work day the track was virtually complete. Four power spike-driving machines and two mechanical anchor applicators were utilized, with two spikers and one anchor applicator being kept in reserve
A buffer rail was installed ahead and behind all insulated joints and at turnouts for future adjustments, if needed, account of expansion and/or contraction. The buffer rails varied in length but in every case were shorter than the conventional rail length of 39 ft. The insulated joints and buffer rails were trucked to signal sites and made up in place, and the turnouts were installed in advance of the rail laying.
The rail laying across the concrete dam structure was particularly hazardous as the width of the concrete bridge decks supported on the dam across the Cumberland River and the clearance at the bridge girder knee braces would not permit normal operation of the speedswing, and it was necessary to revise the operation so that the rails could be pulled from the rail train across this portion of dam with a minimum effort.
During the entire rail-laying operation three-way radio communication was main- tained between the rail-train locomotive engineer, speedswing operator and the employee supervising the rail unloading.
The rail anchoring pattern varied with the length of each string of welded rail. On the longer strings of rail 234 ft (6 conventional rail lengths) on each end were con- tinuously anchored, every other tie being box anchored and anchors placed on rail at each intermediate tie to prevent movement away from joint. Along the center of each string of rail every third tie was box anchored. The shorter strings were anchored in a similar manner with continuous anchoring reduced in accordance with length.
Usually, when welded rail is laid on the Illinois Central replacing existing rail, the rails are butt jointed, and an atmospheric temperature in the vicinity of 85 F is con- sidered ideal for progressing the work. Since the Barkley Project was new construction and working temperatures were normally below 85 F, it was decided to shim the joints, allowing 1-in thickness of shim for each 10 deg of temperature below 85 deg. Since the newly laid rail was not opened to traffic, some difficulty was encountered in closing the shimmed joints. In view of this, it is felt that on similar types of construction rail anchors should not be installed until immediately after removal of shims and joint closure is obtained by normal expansion of the newly laid rail.
The ballast was unloaded from railroad cars in a conventional manner and the track was surfaced with two multiple tampers and one tamping jack. The ballast was regulated and dressed with a ballast maintenance car.
A trackliner with a line indicator was used for lining the completed track. Excellent results were obtained with this machine, which was operated by one employee with occasional assistance of one additional employee when lining curved track.
Barkley Dam Relocation 11
Miscellaneous Buildings
The project involved the construction of a freight depot at Fairview, Ky., and an extension to the relocated depot at Grand Rivers, Ky.
The work at Grand Rivers consisted of the construction of an U-ft by 16-ft 4-in centralized train control operator's office and relocating the existing freight station con- tinuous thereto. The work at Fairview involved constructing a freight station using serviceable materials salvaged from the Eddyville freight depot plus additional new materials required.
Miscellaneous tool houses and telephone booths throughout the project were relocated.
Road Crossings
Highway grade crossings were constructed in accordance with Illinois Central draw- ing No. 5.10 entitled "Ballast Road Crossings."
Roadway and Track Signs
All roadway and track signs were constructed to conform with the Illinois Central's standards and practices and Kentucky state laws.
Communication Work
All communication pole-line construction involving open wire and aerial cable was performed in accordance with the applicable recommendations of the National Electrical Safety Code and more particularly in accordance with the provision of recommended practice of the AAR as set forth in "Specifications for the Construction of Railroad Communication Pole Lines, l-A-6." Where circuit faciHties were installed below ground level the construction conformed to the AAR's "Specification for Underground Cable Installation, l-C-2."
The communication work was started shortly ahead of track construction to permit distribution and installation of poles with the communication department winch truck.
Signal Work
The signal system was constructed by the Illinois Central to comply with the Inter- state Commerce Commission Bureau of Safety Rules, Standards and Instructions, sub- ject to its approval and substantially in accordance with the signal track plan prepared for the project. The signal system represents modern signal practices as recommended by the AAR.
The signal work was partially completed during the early phases of construction with the portion of the installation located on Barkley Dam being deferred until February 1, 1965, when the signal gang moved back to the project. The work was then progressed to completion during the summer of 1965.
Progress of Work
Prior to beginning of railroad construction, the Corps of Engineers advised the railroad company that construction at Barkley Dam was delayed approximately one year but requested the company to proceed with track and other related work as originally scheduled. In view of this, it was necessary to defer approximately two miles of construction until completion of Barkley Dam. The deferred work involved approx- imately 1.7 miles of construction on the earth-fill portion of Barkley Dam and approx-
12 , Barkley Dam Relocation
imately 0.3 miles of construction on the concrete structure. Track work was progressed from each end of the project to the ends of the dam as rapidly as possible, although it was the opinion of railroad representatives that the actual beginning of the track work should have been delayed to coincide with dam completion in order to permit more efficient utilization of work forces and equipment.
On completion of the initial phase of the railroad work, the Corps of Engineers requested the company to clear all existing right-of-way below the normal pool eleva- tion of 359 on a cost-reimbursable basis. It was thought the railroad company could accomplish the work with less interference and hazards to its equipment and employees than a contractor employed by the Corps of Engineers. The right-of-way clearing was completed in late summer of 1964 and at that time the entire project was closed down to await completion of Barkley Dam.
Railroad construction was reactivated and completed during the summer of 1965. The new line was placed in operation in October 1965.
■4 A
> ti ' i I H ^i i* IT i
Advance Report of Committee 3 — Ties and Wood Preservation K. C. Edscorn, Chairman
Termite Control Investigation — Inspection of Specimens After 100 Months of Exposure^=
ABSTRACT
This is a report of progress in the 15 -year investigation to determine the most effective preservative, with minimum retention, for treating either oak, pine or fir species to reduce decay and termite attack. The results of the investigation after 100 months of exposure of the specimens are:
1. Specimens treated with coal-tar creosote show less decay and termite attack than specimens treated with other preservatives (see Table 7 and Figs. 2 to 13, incl.).
2. The diagrams on Figs. 2 to 13, incl., indicate that chromated zinc chloride and tanalith are affording less protection against decay and termite attack than the other preservatives.
3. In general, the fir specimens treated with most of the preservatives, are subject to less decay and termite attack than the oak and pine specimens; however, oak is generally more resistant to decay and termite attack than pine or fir when not treated.
* .\.^R Research Department Report No. ER-66.
13
14 Termite Control Investigation
4. Decay and termite attack are quite rapid in the untreated specimens, but can be reduced considerably by treating the specimens with the lower retentions of any of the preservatives, even chromated zinc chloride or tanalith.
INTRODUCTION
This report presents the results of an inspection of about 2000 treated and untreated specimens in the exposure test plot of the Austin Cary Memorial Forest of the Univer- sity of Florida near Gainesville, Fla., after about 100 months of exposure.
The report of the initial installation of 1296 treated specimens and 30 untreated control specimens placed in the exposure test plot in November 1957 may be found in the 1959 Proceedings, Vol. 60, page 131. This detailed report covers the treatment of the specimens, chemical analysis of the preservatives and installation of the treated specimens and the untreated controls. A total of nine different preservations were used to treat the oak, pine and fir specimens, using three different retentions for each preservative.
A supplemental installation involving the use of four additional preservatives was made in November 1959. A detailed report covering this installation of 576 treated specimens and 15 untreated controls is included in the 1961 Proceedings, Vol. 62, page 95. Detailed reports covering the inspection of the specimens after 40 months, 52 months, 64 months, 76 months and 88 months are described in Engineering Research Division reports ER-16, ER-23, ER-38, ER-46 and ER-59, respectively, with the gen- eral conclusion in all five reports that only those specimens treated with coal-tar creosote had afforded more resistance to both decay and termite attack than the other preservatives.
The investigation is being conducted under the general direction of G. M. Magee, director of engineering research. Engineering Division, Research Department, AAR. The conduct of the investigation and preparation of the report were in charge of E. J. Ruble, executive research engineer, research staff, AAR. The inspection of the specimens was conducted on February 14 and 15, 1966, by Dr. J. B. Huffman of the University of Florida; W. F. Arksey, F. J. Fudge and C. Morton, members of Committee 3 — Ties and Wood Preservation; G. B. Mills, Wood Treating Chemicals Co.; I. Williams, South- ern Pine Inspection Bureau; R. W. Wellwood, Faculty of Forestry, University of British Columbia, Vancouver, B. C; and E. J. Ruble, K. W. Schoeneberg and I. A. Eaton, research staff, AAR. Funds for the investigation are being provided by the AAR.
GRADING
The system of specimen grading for both decay and termite attack used during the inspection corresponds to that recommended by the American Wood Preservers Asso- ciation. The code numbers and letters of the system are listed below, with the cor- responding ratings developed by such grades:
Code Rating,
No. Decay Grades Percent
1 Sound, no evidence of decay 100
2 Localized superficial decay 75
3 Slight but positive decay SO
4 Deep or severe decay 25
5 Failure, almost complete loss of strength 0
Termite Control Investigation 15
Code Rating,
Letter Termite Attack Grades Percent
A Xo attack 100
B Slight termite attack 75
C Moderate termite attack 50
D Severe termite attack 25
E Failure caused by termites 0
FIELD INSPECTIONS
The detailed inspection of the specimens was conducted primarily by Dr. Huffman and Mr. Eaton with other members of the inspection party assisting by removing, clean- ing and replacing the test specimens. The first member of the inspection party removed the first 2-in by 4-in by IS-in specimen, buried vertically for half its length, from the ground and after cleaning off the dirt and sand with a spatula, handed it to Dr. Huff- man. Dr. Huffman inspected it and decided, with the help of the other members of the inspection party, the grade of the specimen for both decay and termite attack. Mr. Eaton tabulated the code number and code letter on field data sheets provided by Dr. Huffman. The specimen was then replaced in its original position in the ground while the other members of the party pulled and cleaned the next stake. This procedure was repeated for the entire inspection.
An example of the tabulated decay and termite attack grades, as recorded in the field on the "Field Inspection Data Sheets" is shown on Table 1. The example shows the results of six field inspections of the specimens in rows M, N, and O of plot 2. For example, in position 4 of row M, there is shown specimen 012D/21. As explained in the report covering the installation, the letter "O" designates oak species, "12" the stick num- ber and "D" the fourth specimen cut from stick 12. The figure "2" designates the preser- vative number, which in this case is chromated zinc chloride. The figure "1" represents the retention used in the treatment and in this case is the lowest retention. The inspection of February .i, 1964 indicates this specimen had a grade of "5C", the "5" indicating failure due to decay with the "C" indicating moderate termite attack. The inspection of February 8, 1965 indicated this specimen had a grade of "5E", or complete failure in both decay and termite attack. As another example, there is shown in Table 1, row O, position 2, pine specimen PlOlC/ll treated with the first or lowest amount of creo- sote. All inspections previous to the last inspection of February 15, 1966, indicated there was no decay or termite attack; however, the inspection of February 15, 1066, indicated that while there was no decay, there was evidence of some slight termite attack which resulted in a rating of "IB" as shown.
A close inspection of the Field Inspection Data Sheets indicate that many specimens were graded higher during the 1966 inspection than during the 1965 inspection, particu- larly with respect to termite attack; for example, see row N, position 2. In 1965 the specimen 061B/83 was graded as ''3B" but in 1966 the grading was "3A", a change in termite attack from moderate to slight. In general, upgrading from one year to the next year results from the destruction of physical evidence of former termite attack by the progression of decay fungi. Some difficulty is encountered during inspections in deter- mining whether or not the insect galleries in decayed portions of the specimens were caused by termites or ants. If termites or ants were present during the inspection, a decision could readily be made, but if they were not present, and the usual tell-tale signs were absent, the cause of the galleries could not be definitely determined. Research has shown that ants frequently seek shelter or build nests in decayed wood while ter- mites will drill through decayed wood to get to sound wood.
16 Termite Control Investigation
ANALYSIS OF FIELD INSPECTION DATA
The data on the decay and termite attack grades, as recorded on the Field Inspec- tion Data Sheets were summarized and recorded on the "Classified Data Sheets," ex- ample of which is shown on Table 2. The ratings for both decay and termite attack, in percent, were determined in the manner shown under "Grading."
In the 12-, 25- and 40-month reports, the average index rating was obtained by aver- aging the decay rating with the termite attack rating. This procedure was slightly in variance with the recommendation of ASTM Specification D 1758-60, Evaluating Wood Preservatives by Field Tests. The ASTM recommendation states that the decay and ter- mite grades should be combined, that is, the lowest grade from either cause should be used, and all subsequent average index ratings for our annual inspections are in accord- ance with the ASTM recommendation.
The data on Table 2 show the results of the inspection of all specimens treated with preservative No. 2, chromated zinc chloride having the No. 1 retention. It can be seen that previously mentioned specimen 012D/21 is included under the oak species, the second from the top, with a grade of "SC" assigned to it during the inspection of February 1964, and "5E", complete failure, during the February 8, 1965, inspection. The other nine specimens of like species and preservative retention are also shown accom- apnied by their respective grade. A summary of the grades for this preservative reten- tion and species for the February 15, 1966 inspection is as follows:
5 specimens having a grade of "5E" (complete failure)
1 specimen having a grade of "3C"
2 specimens having a grade of "SC"
2 specimens having a grade of "5D"
10 specimens
The ratings for decay and termite attack were obtained in the following manner:
Decay Termite Attack
Nine (5) at 0= 0 Five (E) at 0= 0
One (3) at 50=50 Three (C) at 50=150
— Two (D) at 25= 50 50-^-10=5.0 =200-^10=20.0
The average index rating was obtained by combining the decay and termite grades, using the lowest grade for each, in the following manner:
Nine (5 or E) at 0=0 One (3 or C) at 50 = 50
50 -^ 10=5.0
RESULTS OF INSPECTION
Untreated Controls
The decay and termite-attack ratings with their average index ratings for the untreated controls installed in February 1962, are shown in Table 3. The values shown in this table are the average of five oak, five fir and ten pine specimens and indicate the general decline in the condition of the specimens over a period of four years, with most of the specimens having completely failed after three years and all specimens hav- ing failed after four years. It can be seen that the average index ratings for the oak
Termite Control Investigation IJ
specimens are higher than those for the fir or pine specimens. The oak specimens appear to be more subject to decay than to termite attack, especially after two or more years of exposure.
The data for the untreated specimens installed in February 1963 are shown in Table 4. It can be seen that the rapid rate of termite attack and decay has continued through the third year. The average index ratings after 36 months of exposure are slightly lower than the ratings for the specimens installed in February 1962 at the end of 36 months.
The data for the untreated specimens installed in February 1964 are shown in Table 5 while the data for the specimens installed in February 1965 are shown in Table 6. It is interesting to note that the termite attack and decay are following the same pat- tern as the other installations after the same number of months of exposure, and about one-half of the specimens can be expected to fail after 36 months of exposure with complete failure of all the specimens occuring after 48 months of exposure.
Treated Specimens
The decay and termite attack ratings after 100 months of exposure of the specimens treated with preservatives 1 to 9, incl., and after 75 months of exposure of specimens treated with preservatives 10 to 13, incl., are tabulated on Table 7. Typical pictures of decay and termite attack are shown on Fig. 1.
The data tabulated in Table 7 for the specimens treated with the No. 1 retention are shown graphically by the bar diagram on Fig. 2, those for retention No. 2 on Fig. 3 and those for No. 3 retention on Fig. 4. In studying Figs. 2, 3 and 4, it should be kept in mind that the No. 1 retention is only half that recommended by the AREA, reten- tion No. 2 is the amount recommended, while retention No. 3 is 100 percent greater than the recommended amount. The bar diagrams indicate that decay and termite attack are now taking place in the specimens treated with coal-tar creosote, particularly in the oak and pine specimens with the No. 1 retention. Decay is even occuring in the oak specimens with the No. 3 retention of creosote. It can be seen that the pine specimens treated with the No. 1 retention of tanalith have failed while the oak specimens are near failure. The oak and pine specimens treated with the No. 1 retention of chromated zinc chloride are also near failure. Considerable termite attack and decay has taken place in the specimens treated with the No. 1 and No. 2 retentions of pentachlorophenol, cop- per napthenate, acid copper chromate, ammoniacal copper arsenite, chromated zinc ar- senate and chromated copper arsenate. The specimens treated with the No. 3 retention of most of the preservatives are now showing some termite attack and decay, with the specimens treated with chromated zinc chloride, tanalith and chromated zinc arsenate showing more than the others.
A careful study of the quality index ratings, as shown on Figs. 2, 3 and 4, clearly indicate that the oak specimens are more subject to decay than the fir or pine specimens for all preservatives and all retentions.
The data on the specimens treated with various combinations of creosote with petroleum or coal tar indicate considerable variation, but it can be seen that these preservatives do not afford the protection given by coal-tar creosote alone. It is evident that such combinations afford more protection against termite attack than decay.
The diagrams on Figs. 5 to 13, incl., show the progressive decrease in the quality index ratings for all three species of wood and the 3 retentions of all 13 preservatives. The original test specimens treated with the 9 preservatives have been exposed for 100 months while the specimens treated with the combinations of creosote and coal tar or petroleum have been exposed for 75 months. It can be seen from Fig. 5 that the oak
18 , Termite Control Investigation
specimens treated with the No. 1 retention of creosote resisted decay and termite attack for 52 months but since that time there has been a gradual decrease in the rating. By projecting the line showing the decrease, it appears that the specimens will be com- pletely gone after 190 months of exposure. For comparison, the oak specimens treated with tanalith have completely failed after 100 months of exposure, and the oak speci- mens treated with chromated zinc chloride will undoubted'y fail in the next few months. It is obvious from the diagrams on Fig. 5 that the cak specimens treated with the No. 1 retention of creosote are showing more resistance to decay and termite attack than those treated with the other preservatives.
The decline in the quality index ratings of the fir specimens treated with the No. 1 retentions are shown on Fig. 6. It can be seen that the specimen treated with creosote or ammoniacal copper arsenite (chemonite) are showing considerable resistance to decay and termite attack, but the ratings of the specimens treated with the other preservatives are only slightly higher than those for the oak specimens.
The decrease in ratings for the pine specimens treated with the No. 1 retentions are shown on Fig. 7. In general, these specimens have about the same ratings as the oak specimens, with the specimens treated with creosote indicating more resistance to decay and termite attack than the others.
The decrease in the quality index ratings for the other retentions of preservatives are shown on Figs. 8 to 13, incl. It can be seen that there is some reduction in the ratings of the specimens treated with most of the preservatives.
In the report on last year's inspection, mention was made that the Forest Products Laboratory had isolated and submitted to the Forest Disease Laboratory at Laurel, Md., for identification the fungi involved in some of the stakes showing considerable decay which had been removed from the University of Florida test site after several years of exposure. One southern pine stake. No. P34J, treated with 1.04 pcf acid copper chromate (celcure), and three red oak stakes treated with about 0.50 pcf chromated copper arsenate, type A (erdalith), were removed from the AAR test plots after several years exposure. The wood species, preservative and retention, and fungi are as follows:
Southern pine . 1.04 pcf acid copper chromate Poria cocos
Red oak 0.46 pcf chromated copper arsenate, type A Porm cocos
Red oak 0.44 pcf chromated copper arsenate, type A Poria radiculosa
Red oak 0.48 pcf chromated copper arsenate, type A Poria cocos
The fungi are copper tolerant, which undoubtedly accounts for the early decay of some of the treated stakes, but does net account for the termite attack noted.
CONCLUSION
From the data secured during the inspection of treated specimens of oak, fir and pine species after 100 months of exposure, it seems logical to conclude that coal-tar creosote is affording more resistance to decay and termite attack than the other preservatives.
Termite Control Investigation
19
Tablu 1 TERMITE CONTROL INVESTIGATION
AAR RESEARCH CENTER
FIELD INSPECTION DATA SHEET
Plot 2
|
Location |
Code |
Rating of Condition of Specimens on Indicated Date |
|||||||||
|
Row |
Position |
Number |
1-8-59 |
11-13-59 |
2-21-62 |
2-5-62 |
2-4-63 |
2-3-64 |
2-8-65 |
2-15-66 |
|
|
M |
1 |
P94F/32 |
lA |
10 |
IB |
30 |
30 |
3C |
5C |
||
|
2 |
P4UG/92 |
lA |
lA |
lA |
lA |
IB |
10 |
20 |
|||
|
3 |
F103A/32 |
lA |
lA |
lA |
lA |
lA |
10 |
30 |
|||
|
4 |
012D/21 |
IB |
3C |
30 |
3B |
40 |
50 |
* |
* |
||
|
5 |
O107E/81 |
2 A |
3 A |
2R |
3B |
3B |
30 |
5C |
|||
|
6 |
F24H/23 |
lA |
IB |
IB |
IB |
10 |
20 |
||||
|
7 |
F5(iC/93 |
_ |
- |
lA |
lA |
lA |
lA |
||||
|
8 |
P70I/63 |
_ |
lA |
lA |
3B |
3A |
|||||
|
9 |
P58I/72 |
lA |
lA |
lA |
lA |
lA |
2A |
3A |
|||
|
N |
1 |
01U3E/42 |
lA |
lA |
lA |
lA |
lA |
lA |
lA |
||
|
2 |
061B/83 |
_ |
2A |
2A |
3B |
3A |
|||||
|
3 |
053G/53 |
_ |
lA |
lA |
lA |
lA |
|||||
|
4 |
0(i3E/33 |
:;a |
2B |
3B |
30 |
30 |
4C |
||||
|
5 |
F1U4E/31 |
lA |
IB |
2B |
10 |
30 |
30 |
30 |
|||
|
6 |
P48B/12 |
lA |
lA |
lA |
lA |
Runu |
vcd to A, |
KR Lab |
2-5-63 |
||
|
7 |
07I/63 |
- |
lA |
IB |
2B |
2B |
|||||
|
8 |
P42F/81 |
lA |
3A |
20 |
30 |
30 |
30 |
3D |
|||
|
9 |
073B/31 |
lA |
2B |
3B |
3C |
30 |
30 |
30 |
50 |
||
|
O |
1 |
F76D/31 |
lA |
lA |
lA |
IB |
10 |
20 |
30 |
30 |
|
|
2 |
PlOlC/11 |
lA |
lA |
lA |
lA |
lA |
lA |
lA |
IB |
1 |
|
|
3 |
F76C/32 |
lA |
lA |
lA |
2B |
30 |
30 |
30 |
i |
||
|
4 |
FlOA/43 |
. |
_ |
lA |
lA |
lA |
lA |
1 |
|||
|
5 |
F51C/83 |
_ |
_ |
lA |
lA |
lA |
lA |
||||
|
6 |
013G/32 |
2A |
3A |
IB |
3B |
3B |
30 |
3D |
|||
|
7 |
015G/91 |
lA |
lA |
IB |
2B |
3B |
30 |
lA |
|||
|
8 |
0(36A/13 |
lA |
lA |
lA |
lA |
||||||
|
9 |
P42G/41 |
lA |
2A |
IB |
10 |
20 |
30 |
30 |
|||
|
1 |
|||||||||||
|
2 |
|||||||||||
|
3 |
|||||||||||
|
4 |
|||||||||||
|
5 |
|||||||||||
|
6 |
|||||||||||
|
7 |
|||||||||||
|
8 |
|||||||||||
|
9 |
Inspected By:
AWPA Rating Code:
Numbers 1 to 5 indicate degree of decay with Number 1 being sound - no evidence of decay Letters A to E Indicate degree of termite attack wiih A having no attack. * Railed and Removed.
20
Termite Control Investigation
Table 2 TERMITE CONTROL INVESTIGATION
AAR RESEARCH CENTER
CLASSIFIED DATA SHEETS
Preservative No. Retention No.
Chromated Zinc Chloride
|
Species |
Code Number |
Plot Location |
Retention lb. cu. ft. |
Rating of Condition of Specimens on Indicated Date |
|||||
|
2-4-64 |
2-8-65 |
2-15-6e |
|||||||
|
Oak |
O 7H |
3J9 |
0.52 |
50 |
* |
♦ |
|||
|
12D |
?.M4 |
n.4R |
F,r. |
* |
* |
||||
|
15D |
1A5 |
0.51 |
3C |
30 |
5D |
||||
|
20D |
8N9 |
0.48 |
3C |
30 |
5E |
||||
|
21C |
6J1 |
0.50 |
3C |
5D |
* |
||||
|
23G |
4C7 |
0.52 |
4C |
40 |
50 |
||||
|
40G |
1F5 |
0.53 |
3C |
30 |
30 |
||||
|
4in |
5L5 |
0.52 |
50 |
* |
+ |
||||
|
67 F |
7C8 |
0.51 |
30 |
40 |
50 |
||||
|
84 B |
9F6 |
0.48 |
4D |
4D |
5D |
||||
|
Months of Service |
76 |
88 |
100 |
||||||
|
Av. Termite Rating |
45.0 |
30.0 |
20.0 |
||||||
|
Av. Decay Rating |
30.0 |
22.5 |
5.0 |
||||||
|
Av. Index Rating |
27.5 |
22.5 |
5.0 |
||||||
|
No. of Failures |
1 3 |
4 |
9 |
||||||
|
Fir |
F .■HIF |
511 |
0.42 |
10 |
20 |
3 0 |
|||
|
33G |
1K6 |
0.55 |
20 |
30 |
30 |
||||
|
4-4 G |
9G1 |
0.59 |
5D |
* |
* |
||||
|
4?,n |
9H6 |
0.48 |
3D |
3D |
30 |
||||
|
53G |
7B1 |
0.44 |
20 |
20 |
30 |
||||
|
55E |
10J7 |
0.49 |
10 |
20 |
30 |
||||
|
56G |
4C5 |
0.55 |
30 |
30 |
30 |
||||
|
61E |
805 |
0.55 |
20 |
30 |
30 |
||||
|
70C |
4 07 |
0.54 |
30 |
30 |
30 |
||||
|
74G |
10L5 |
0.52 |
30 |
30 |
30 |
||||
|
Months of Service |
7fi |
88 |
100 |
||||||
|
Av. Termite Rating |
45.0 |
42.5 |
45.0 |
||||||
|
Av. Decay Rating |
62.5 |
52.5 |
45.0 |
||||||
|
Av. Index Rating |
42.5 |
42.5 |
45.0 |
||||||
|
No. of Failures |
1 |
1 |
1 |
||||||
|
Pine |
P 27T |
2D3 |
0.50 |
30 |
30 |
50 |
|||
|
28H |
8L7 |
0.51 |
3D |
3E |
* |
||||
|
311 |
911 |
0.50 |
* |
* |
* |
||||
|
53H |
10F2 |
0.51 |
4E |
+ |
* |
||||
|
341 |
417 |
0.51 |
5D |
+ |
* |
||||
|
371 |
5C9 |
0.49 |
2D |
5D |
+ |
||||
|
381 |
7D1 |
0.50 |
3D |
3D |
4E |
||||
|
39J |
3F8 |
0.51 |
4D |
4F |
* |
||||
|
47 H |
10D3 |
0.50 |
3D |
3D |
30 |
||||
|
48H |
3J8 |
0.49 |
4E |
* |
* |
||||
|
Months of Service |
76 |
88 |
100 |
||||||
|
Av. Tormlto Rating |
20.0 |
12.5 |
10.0 |
||||||
|
Av. Decay Rating |
35.0 |
22.5 |
7.5 |
||||||
|
Av. Index Rating |
17.5 |
10.0 |
5.0 |
||||||
|
No. of Failures |
4 |
7 |
9 |
AWPA Rating Codo;
Numbers 1 to 5 Indicate degree of decay with No Letters A to E indiculo degree of termite altaelc ♦Failed and Removed.
. 1 being sound - no evidence of dociiy. with A having no attack.
Termite Control Investigation
21
Table 3 SUMMARY OF INDEX RATINGS UNTREATED SPECIMENS INSTALLED: FEB. 1962
|
T = Termite or D •* Decay |
12 ^foaths Exposure |
24 Months Exposure |
36 Months Exposure |
48 Months Exposure |
||||||||
|
Oak |
Fir |
Rne |
Oak |
Fir |
Pine |
Oak |
Fir |
Rne |
Oak |
Fir |
Pine |
|
|
T D AV. INDEX |
55.0 75.0 50.0 |
60.0 80.0 25.0 |
47.5 47.5 32.5 |
50.0 30.0 30.0 |
20.0 25.0 15.0 |
5.0 15.0 0 |
30.0 15.0 15.0 |
15.0 15.0 15.0 |
0 0 0 |
20.0 0 0 |
0 0 0 |
0 0 0 |
|
No. of Failures |
0 |
0 |
3 |
1 |
3 |
10 |
3 |
3 |
10 |
5 |
5 |
10 |
Table 4 SUMMARY OF INDEX RATINGS UNTREATED SPECIMENS INSTALLED: FEB. 1963
|
T = Termite |
12 Months |
24 Months |
36 Months |
||||||
|
or D = Decay |
Exposure |
Exposure |
Exposure |
||||||
|
Oak |
Fir |
Pine |
Oak |
Fir |
Pine |
Oak |
Fir |
Rne |
|
|
T |
50.0 |
35.0 |
40.0 |
55.0 |
20.0 |
30.0 |
25.0 |
10.0 |
0 |
|
D |
50.0 |
55.0 |
45.0 |
30.0 |
40.0 |
20.0 |
10.0 |
20.0 |
0 |
|
AV. INDEX |
40.0 |
35.0 |
40.0 |
30.0 |
20.0 |
20.0 |
^9,1 0 |
10.0 |
0 |
|
No. of |
|||||||||
|
Failures |
0 |
1 |
1 |
2 |
3 |
2 |
3 |
3 |
5 |
Table 5 SUMMARY OF INDEX RATINGS UNTREATED SPECIMENS INSTALLED: FEB. 1964
|
T = Termite or D = Decay |
12 Months Exposure |
24 Months Exposure |
||||
|
Oak |
Fir |
Rne |
Oak |
Fir |
Rne |
|
|
T D AV. INDEX |
55.0 60.0 50.0 |
55.0 65.0 55.0 |
50.0 70.0 50.0 |
75.0 40.0 35.0 |
35.0 35.0 25.0 |
30.0 25.0 20.0 |
|
No. of Failures |
0 |
0 |
0 |
1 |
1 |
2 |
Table 6 SUMMARY OF INDEX RATINGS UNTREATED SPECIMENS INSTALLED: FEB. 1965
|
T = Termite or D = Decay |
12 Months Exposure |
||
|
Oak |
Fir |
Rne |
|
|
T D AV. INDEX |
50.0 75.0 50.0 |
50.0 55.0 40.0 |
50.0 50.0 50,0 |
|
No. of Failures |
0 |
0 |
0 |
22
Termite Control Investigation
Table 7 SUMMARY OF QUALITY INDEX RATINGS TREATED SPECIMENS
|
Months |
T=Termite |
No. |
1 Retention |
No. 2 |
Retention |
No. 3 Retenti |
on |
||||
|
Pres. |
Service |
D=Decay |
Oak |
Fir |
Pine |
Oak |
Fir |
Pine |
Oak |
Fir |
Pine |
|
T |
97.5 |
100.0 |
90.0 |
100.0 |
100.0 |
97.5 |
100.0 |
100.0 |
100.0 |
||
|
1 |
100 |
D |
67.5 |
95.0 |
72.5 |
77.5 |
100.0 |
97.5 |
97.5 |
100.0 |
100.0 |
|
AV. |
67.5 |
95.0 |
70.0 |
77.5 |
100.0 |
97.5 |
97.5 |
100.0 |
100.0 |
||
|
T |
20.0 |
45.0 |
10.0 |
42.5 |
50.0 |
35.0 |
50.0 |
57.5 |
52.5 |
||
|
2 |
100 |
D |
5.0 |
45.0 |
7.5 |
35.0 |
52.5 |
50.0 |
47.5 |
77.5 |
60,0 |
|
AV. |
5.0 |
45.0 |
5.0 |
35.0 |
47.2 |
37.5 |
45.0 |
57.5 |
52.5 |
||
|
T |
12.5 |
47.5 |
0 |
42.5 |
65.0 |
52.5 |
87.5 |
77.5 |
65.0 |
||
|
3 |
100 |
D |
2.5 |
45.0 |
0 |
20.0 |
52.5 |
45.0 |
40.0 |
72.5 |
57.5 |
|
AV. |
0 |
45.0 |
0 |
20.0 |
52.5 |
45.0 |
40.0 |
67.5 |
52.5 |
||
|
T |
62.5 |
50.0 |
50.0 |
92.5 |
67.5 |
60.0 |
100.0 |
100.0 |
95.0 |
||
|
4 |
100 |
D |
52.5 |
67.5 |
57.5 |
80.0 |
75.0 |
67.5 |
97.5 |
100.0 |
92.5 |
|
AV. |
52.5 |
50.0 |
50.0 |
77.5, |
67.5 |
55.0 |
97.5 |
100.0 |
90.0 |
||
|
T |
67.5 |
60.0 |
55.0 |
1 95.0 |
97.5 |
82.5 |
100.0 |
100.0 |
100.0 |
||
|
5 |
100 |
D |
50.0 |
65.0 |
55.0 |
72.5 |
97.5 |
90.0 |
90.0 |
100.0 |
100.0 |
|
AV. |
50.0 |
57.5 |
47.5 |
72.5 |
95.0 |
80.0 |
90.0 |
100.0 |
100.0 |
||
|
T |
57.5 |
50.0 |
40.0 |
87.5 |
82.5 |
62.5 |
92.5 |
95.0 |
82.5 |
||
|
6 |
100 |
D |
25.0 |
60.0 |
50.0 |
65.0 |
92.5 |
72.5 |
90.0 |
100.0 |
100.0 |
|
AV. |
25.0 |
52.5 |
40.0 |
62.5 |
82.5 |
62.5 |
80.0 |
95.0 |
82.5 |
||
|
T |
92.5 |
95.0 |
75.0 |
97.5 |
100.0 |
97.5 |
100.0 |
100.0 |
100.0 |
||
|
7 |
100 |
D |
52.5 |
97.5 |
60.0 |
62.5 |
95.0 |
70.0 |
70.0 |
97.5 |
100.0 |
|
AV. |
52.5 |
95.0 |
57.5 |
62.5 |
95.0 |
70.0 |
70.0 |
97.5 |
100.0 |
||
|
T |
45.0 |
67.5 |
47.5 |
75.0 |
82.5 |
62.5 |
87.5 |
95.0 |
90.0 |
||
|
8 |
100 |
D |
27.5 |
52.5 |
27.5 |
55.0 |
65.0 |
47.5 |
50.0 |
77.5 |
77.5 |
|
AV. |
27.5 |
50.0 |
27.5 |
52.5 |
62.5 |
47.5 |
50.0 |
77.5 |
75.0 |
||
|
T |
37.5 |
67.5 |
55.0 |
70.0 |
85.0 |
65.0 |
97.5 |
100.0 |
87.5 |
||
|
9 |
100 |
D |
25.0 |
67.5 |
57.5 |
50.0 |
80.0 |
70.0 |
95.0 |
97.5 |
97.5 |
|
AV. |
25.0 |
57.5 |
55.0 |
50.0 |
77.5 |
60.0 |
92.5 |
97.5 |
87.5 |
||
|
T |
90.0 |
95.0 |
100.0 |
92.5 |
100.0 |
100.0 |
100.0 |
100.0 |
100.0 |
||
|
10 |
75 |
D |
65.0 |
97.5 |
97.5 |
57.5 |
100.0 |
100.0 |
75.0 |
100.0 |
100.0 |
|
AV. |
65.0 |
95.0 |
97.5 |
57.5 |
100.0 |
100.0 |
75.0 |
100.0 |
100.0 |
||
|
T |
92.5 |
97.5 |
95.0 |
97.5 |
100.0 |
97.5 |
100.0 |
100.0 |
100.0 |
||
|
11 |
75 |
D |
55.0 |
100.0 |
77.5 |
77.5 |
100.0 |
90.0 |
75.0 |
100.0 |
100.0 |
|
AV. |
55.0 |
97.5 |
77.4 |
77.5 |
100.0 |
90.0 |
75.0 |
100.0 |
100.0 |
||
|
T |
95.0 |
100.0 |
65.0 |
97.5 |
100.0 |
100.0 |
100.0 |
97.5 |
100.0 |
||
|
12 |
75 |
D |
52.5 |
97.5 |
70.0 |
65.0 |
100.0 |
97.5 |
75.0 |
100.0 |
100.0 |
|
AV. |
52.5 |
97.5 |
55.0 |
65.0 |
100.0 |
97.5 |
70.0 |
97.5 |
100.0 |
||
|
T |
80.0 |
92.5 |
67.5 |
97.5 |
100.0 |
100.0 |
100.0 |
100.0 |
100.0 |
||
|
13 |
7 5 |
D |
57.5 |
92.5 |
65.0 |
72.5 |
100.0 |
97.5 |
75.0 |
100.0 |
100.0 |
|
AV. |
55.0 |
90.0 |
57.5 |
72.5 |
100.0 |
97.5 |
75.0 |
100.0 |
100.0 |
Specimens ti-eated witii preservatives 1 to 9 incl. were installed in November 1957. Specimens treated with preservatives 10 to 13 incl. were installed in November 1959. Inspection Date: Februaiy 1966.
Termite Control Investigation
23
Oak specimen treated with chromated zinc arsenate showing surface softness due to decav.
Pine specimen treated with tanalith showint: lailuic due to termite attack and near failure due to decay.
Fig. 1 — Pictures of typical decay and termite attack.
24
Termite Control In\estigation
SUMMARY OF QUALITY IMDFX RATINGS
TREATED SPECIMITM^ RETENTIOM: i
Termite Control Investigation
25
FIS 3
SUMMARY OF QUALITY INDEy RATINGS
tpekted specimens
retention 2
26
Termite Control Investigation
.SlJMM/yRV fjF QUALITY INIDfX RATINGS
TRFATED 3PECIMEMS RRTFNTION; 3
|
PRE.';EP'/ATIVF. |
AVP fXPQ.?URF. RflF.NriON TIME lb/ft'' months |
•SPFClF.n |
OUAI ITY INDFX RATING- PFRCFNT SYMBOL-. ^^ iIImM? 100 90 8,0 7p e,p bO 40 3p 20 i |
P Q |
||||||||
|
1 COAL TAP CREOSOTE |
16 4 16 4 100 l.'S.g |
OAK F 1 R PINE OAK F 1 R PI ME OAK r 1 R PINF 0/>K 1^: R PI ME |
'■I/7a7J7 |
r/7.7rui. |
||||||||
|
2 CHROMATED ZINC CHLORIDE |
1.99 2.00 , 100 2.04 |
'/.■////, |
,■,,■,■///,'/,•/ M |
! |
||||||||
|
■i/li',:t,i!i::,'!- |
||||||||||||
|
"./ /v |
||||||||||||
|
^.. "■: ■:■ |
||||||||||||
|
3 TANALITH |
0 98 1.08 100 0.99 |
|||||||||||
|
-;;;:,: |
||||||||||||
|
i^L—- |
||||||||||||
|
:^:::7:rii/jj::Li/.\ |
jii;ii:vi' |
1 |
, |
|||||||||
|
1 1 1 i |
* |
|||||||||||
|
4 PENTACHLOROPHENQL |
15.1 14 5 100 15.8 |
|||||||||||
|
5 COPPER NAPTHENATE |
12.2 i 16.3 ; 100 16.8 |
OAK -IR PINE |
||||||||||
|
6 ACID COPPER CHROMATE (Celcure) |
1.98 2.13 100 2.07 |
OAK FIR PINE |
'T'JTTT/ |
.■7, |
\ 1 |
|||||||
|
f/]JA |
||||||||||||
|
7 AMMONIACAL COPPER ARSE^JlTE(C^.emoo■.f=) |
1.00 0.75 1 100 0.79 |
OAK FIR PINE |
! 1 |
|||||||||
|
- |
||||||||||||
|
8 CHROMATED ZINC ARSENATE(BoliJ.-S<.lt) |
1 96 : 1.86 1 100 2.00 : |
OAK FIR PINE |
-TTT-irjk |
LL\ |
i |
|||||||
|
/ ■ -^. ^^ |
i 1 i \ |
|||||||||||
|
r; 1! ; // |
-ZZZil ' ^ |
r |
||||||||||
|
"^•^^^ |
i^^^^^l |
• |
||||||||||
|
9 CHROMATED COPPER ARSENATE (Gree.ia it) |
1.51 1,48 100 1.50 1- - - |
OAK FIR PI NE OAK Fl R PINE OAK FIR PINE |
ZJ, |
yz/'.-i |
■I |
|||||||
|
10 50 7„ CREOSOTE 40 7. COAL TAR |
15.32 , 16.16 75 16.30 |
|||||||||||
|
1 1 80 7. CREOSOTE 20 7. COAL TAR |
16.13 is.ya 75 16.2 7 |
|||||||||||
|
12 50 7. CREOSOTE 507. PETROLEUM |
15.69 16.27 1 75 16.41 |
OAK Fl R PINE |
||||||||||
|
'i |
||||||||||||
|
13 25 7. CREOSOTE 75 7. PETROLEUM |
16.37 ^ 16.27 75 lb 56 |
OAK F IR PINE |
||||||||||
|
m |
1 |
T e r m i t f Control I n v i- s t i g a t io n
21
O
z
1- < a. _
X d
_ LU 7 Ul
7 7-0
o S 5 "^ - 2 Q-
ti- >- (_ (O
O a
vD <
a
|
i |
< o D -J s o |
Y IMDEX RATING |
/ / / |
O |
||||
|
- |
/ |
o |
||||||
|
\ |
t r - / |
o |
||||||
|
^ |
\' |
s |
||||||
|
/ |
1 |
o |
||||||
|
i |
/ / « |
I X 1 |
o |
|||||
|
// |
^;^ |
^' |
Si |
|||||
|
^i - |
y ' |
//// |
■ X A' |
s |
||||
|
/ |
/// .■ |
/ 'V 1 A |
||||||
|
/ |
7//<:;^^T |
o |
||||||
|
/ |
J:^\^X— |
|||||||
|
|
— / \/^^^/J/ \ - ' |
o |
||||||
|
1 1 =rf |
4^/ J A \ .5, |
o |
||||||
|
M |
Myy |
0 z |
fii f^^l li — — |
|||||
|
/^wf |
J |
/ |
£ J z >" ^ J a« |
Q |
||||
|
1 y |
\ |
f |
/ |
^< f SI ..aot o-> |
||||
|
/ |
JA |
-J |
/ |
|||||
|
/^ |
^ |
Q t><SJ222SS° |
c |
|||||
|
< S z O 3 < • Oa |
^2Si|p5?5 |
|||||||
|
*'^\jl i |
— |
5Scixi|S?^ |
0 |
|||||
|
f : |
\ |
i |
iN30>j3d - ONiiVd xiaNi Ainvno
28
Termite Control Investigation
o- a:
iN3Db3d - oNiivy xiaNiiAinvnb
Termite Control Investi gat ion
29
^- Q
X o
5 z ^ ^ " -
ill <
iN33a3d - siNiivy xiQNi Ainvno
.^0
Termite Control Investigation
|
o |
|
|
z |
|
|
H |
|
|
< |
|
|
cc |
CM |
|
X |
O |
|
UJ |
V |
|
o |
|
|
z |
7 |
|
— |
O |
|
>- |
H |
|
7 |
|
|
_J < 3 |
LU 1- |
|
C |
Qi |
--S
|
i |
||||||||||
|
\ |
||||||||||
|
\ 3 ! |
\ 1 / \ / |
i |
V / |
/ |
||||||
|
/ |
\ </ |
|||||||||
|
<i |
Y |
Ji |
} |
/ |
||||||
|
J |
/ |
|||||||||
|
■7f |
/ W |
|||||||||
|
/ / |
' / / / / \ A 11 y |
/'/ |
||||||||
|
rf |
||||||||||
|
A |
^Jf J^J J^y^ A |
X ' / ^ |
1 |
|||||||
|
n |
Try'y |
! i i r-^ |
||||||||
|
uW. |
/ |
^^ |
||||||||
|
02 USSzS'"'"' 0I<,^O«-»IliQQQirt ^ Lii-a:o-<<OL;*«S5, |
||||||||||
|
fjy |
1 i |
|||||||||
|
A '' ^ |
||||||||||
|
L/i . |
1 |
|||||||||
|
I |
• o |
■ n |
<< ♦ox |
«*oe |
S (/7
I f- 2
S o 2 I
o
I-
iN3Db3d- ONiivy xaawi AiiivnG
Termite Control Investigation
.^1
Cr t£
iN3oa3d - ONiivb \daNi Aiinvnb
i2
Termite Control Investigation
< X d
- — S w
o >.
2 m
< t^
a a
Ld <
LlI
|
\ |
/ |
7/ |
/ |
/ |
1 |
|||||||
|
1 |
/ |
- 1/ |
/ |
|||||||||
|
/ |
/ |
/ |
J» |
|||||||||
|
/ |
y |
|||||||||||
|
«) |
-1 |
u |
' |
/ |
r |
/ ! / |
||||||
|
V |
A/ |
A |
// |
|||||||||
|
/ ^ |
/- |
//^ |
||||||||||
|
nrf |
l^ |
Y |
/■ |
^ |
||||||||
|
T |
// |
i(/ ff |
/ |
- < ^ ^ - 5 |
||||||||
|
V |
Wl |
V |
||||||||||
|
^Lk^ |
||||||||||||
|
$ |
^(fy |
|||||||||||
|
^ |
7 |
|||||||||||
|
/ |
||||||||||||
|
• |
OaO |
<<1 ♦Ox |
8«0« |
iNB^yad - ONiiva xjQNiAinvnb
Termite C ontrol Investigation
33
z
I- <
X o
j.N3Daad - ONUva xsoNiAinvno
Uul. 601
34
Termite Control Investigation
|
o |
|
|
z |
|
|
(- |
|
|
< |
|
|
a: |
A) |
|
X |
o |
|
Ll) |
7 |
|
O |
|
|
z |
Z |
|
"" |
o |
|
> (- |
1- 7 |
|
< |
UJ 1- |
|
a |
a |
|
111 |
|
|
o |
|
|
< |
|
|
a: |
|
|
Ul |
|
|
> |
|
|
< |
|
'4 |
? |
\ |
|||||||||||
|
t |
J, |
||||||||||||
|
£ |
/ |
/ |
} |
/ |
|||||||||
|
« |
/ |
/ |
|||||||||||
|
^ |
|||||||||||||
|
V |
y |
1 |
|||||||||||
|
« |
/ |
1 |
|||||||||||
|
ii |
|||||||||||||
|
1 |
|||||||||||||
|
i& |
/ |
1 i |
^^'~ |
||||||||||
|
2 |
V |
/ |
^ - "i |
||||||||||
|
•S |
»- -« — f |
OltulOL-^IIOOoJl U UKSu<«OL;>000il~ |
|||||||||||
|
1 / |
|||||||||||||
|
// |
|||||||||||||
|
. ,__, , |
• o«n |
<< ♦o* |
«*o« |
8 <n
I I- z o
I
o o
o o>
lN3oy3d - ONiiva x3aNi Ainvno
Termite Control Investigation
3S
z
I- < a: m
X 6
o
z z
o
Z U UJ Z
or tt-
±N3Dy^d- ONiivy xiaNiAinvnfe
Advance Report of Committee 30 — Impact and Bridge Stresses
N. E. Ekrem, Chairman
Field Investigation of Longitudinal Forces in a Concrete Trestle on the Santa Fe Railway*
A. DIGEST
This report contains a description and an analysis of the test data obtained on a 660-ft-long concrete trestle on the Atchison, Topeka & Santa Fe Railway near Dallas, Tex., designated as Bridge No. 50.9. The trestle consists of 20 spans of 33-ft prestressed concrete box beams on reinforced concrete caps and columns. Its height, base of rail to ground line, is uniform throughout at 26 ft. The purpose of this investigation was to determine the effect on the trestle of braking and traction as developed by a 278-ft-long test train. Direct and bending stresses were obtained in the bents and axial stresses obtained in the rails at each abutment. Runs were made with both tight and loosened rail joints. In addition to the braking and traction runs, normal-speed runs were made to determine stresses in the box beams and columns.
A brief summary of the data follows:
1. Braking to a stop on the bridge:
AAR Research Department Report No. ER-67.
38 Longitudinal Forces in a Concrete Trestle
a. The longitudinal force was tranmitted to all bents irrespective of the train position, was highest for bents under the test train and gradually decreased with increase in distance from the test train.
b. Loosening the rail joints at each end of the bridge increased the longitudinal force to the bents.
c. The longitudinal force applied at the top of cap caused the columns to act as cantilever beams fixed below the ground line.
d. The maximum column bending stress was 280 psi when the rail joints were tight and 295 psi when loosened. The corresponding longitudinal forces applied at the top of the caps to produce these stresses were 5.5 kips and S.9 kips, respectively.
e. The total braking force to all bents based on the average of several similar runs was 59.6 kips when the rail joints were tight and 66.8 kips when the joints were loosened.
f. The total braking force to the rails based on the average of several similar runs was 44.2 kips for tight joints and 8.4 kips for loosened joints.
g. The longitudinal force of braking as calculated from the recorded acceleration was more than the sum of the bent forces and rail forces, indicating that some of the total braking force was resisted by pressure against the abutment backwall.
h. The maximum recorded longitudinal movement of a bent was ^g in with tight
rail joints and % in with loosened joints, i. The AREA specified braking force to a bent for an E 72 train is 50.2 kips and
for the test train, 23.8 kips. The railroad's E 65 design was based on a bent
force of 16.3 kips. The maximum recorded bent force produced by the test train
was 5.5 kips.
2. Starting on the bridge and accelerating off:
a. Items a, b and c described above for braking apply also to traction except that the applied forces were in the opposite direction.
b. The maximum column bending stress due to traction was 162 psi when the rail joints were tight and 168 psi when loosened. The corresponding forces at the caps to produce these stresses were 3.4 kips and 3.5 kips, respectively.
c. The total force to all bents based on the average of several similar runs was 17.4 kips when the rail joints were tight and 25.5 kips when the joints were loosened.
d. The total force to the rails based on the average of several similar runs was 17.3 kips for tight joints and 5.6 kips for loosened joints.
e. The longitudinal force of traction as calculated from the recorded accelerations is more than the sum of the bent forces and the rail forces, indicating that some of this total traction force was resisted by pressure against the abutment backwall.
f. The maximum recorded longitudinal movement of a bent was tV in with the tight rail joints and J^ in with loosened joints.
g. The AREA specified traction force to a bent for an E 72 train is 77.6 kips, and for the test train, 39.5 kips. The railroad's E 65 design was based on a bent force of 16.3 kips. The maximum recorded bent force produced by the test train was 3.4 kips.
Longitudinal Forces in a Concrete Trestle 39
3. Braking to a stop on the bridge produced considerably higher stresses in the columns and in the rails than did starting on the bridge and accelerating off.
4. Braking across the bridge and stopping beyond it produced negligible bending stresses in the columns, no higher than those resulting from eccentricity of the vertical loads
5. Normal running over the bridge (without braking or traction) :
a. For the prestressed concrete beams, the ratio of recorded to calculated static strains under the test locomotives ranged from 0.83 to 0.94.
b. The transverse distribution of load to the beams was very nearly uniform, with each beam carr>-ing about 25 percent of the total load.
c. The maximum recorded stress in the beams was 615 psi, occurring under a car. In general, the locomotives produced lower stresses than the cars.
d. The maximum recorded direct static stress in a column was 170 psi.
e. The maximum recorded static bending stress due to eccentricity of the point of application of the vertical loads was 131 psi. This bending stress was highest at the top of the column near the cap.
f. The maximum recorded direct compressive stress in a column was 195 psi at a speed of 20 mph.
B. FOREWORD
The field investigation was conducted in November 1964 by the Association of American Railroads Research Center staff under the sponsorship of AREA Committee 30 — Impact and Bridge Stresses, which has had an assignment on the determination of longitudinal forces in bridge structures. The AAR provided the equipment and personnel as part of the research activity of the Research Department, of which W. M. Keller is vice president and G. M. Magee is director of engineering research. Funds for the field work and preparation of this report were provided by the AAR.
The investigation was under the general direction of F. P. Drew, research engineer structures; assisted in the office by D. W. Wilki, chief draftsman, and C. S. Somogy, assistant structural engineer; and in the field by M. F. Smucker, electrical engineer, R. F. Laskowski, assistant electrical engineer and H. H. Remington, electronic assistant. This report was written jointly by Messrs. Drew and Wilki.
C. TEST SPAN AND LOCATION OF GAGES
Bridge No. 50.9 is shown on Fig. 1 and miscellaneous bridge details are on Fig. 2. The bridge was built in 1964 and carries a single track on a ballasted deck. As men- tioned before, the bridge consists of twenty 33-ft spans and has a total length of 660 ft 1 in. Each span is comprised of four prestressed concrete box beams 32 ft 11 in long. Each beam is rectangular, 3 ft 6 in wide by 2 ft 3 in deep. The bearings for all beams are 1-in-thick elastomeric pads. Each bent consists of a cast-in-place reinforced con- crete cap and three columns. Each of the three columns per bent is cylindrical, 2 ft in diameter. The columns were cast-in-place in holes drilled 15 ft into the ground, and at least 1 ft into rock.
The beams have longitudinal recesses near the top which formed shear keys when the beams were erected. Thse keyways were filled with a cement grout. The spans were post-tensioned transversely at the center and at the ends with lJ4-in-diameter rods 14 ft 1 in long. The design of the beams was based on:
40 ' Longitudinal Forces in a Concrete Trestle
/', = 250,000 psi
} s = 1 75,000 psi (0.7/',)
/',• = 5,000 psi
jc— 2,000 psi (0.4 /O
Each beam is prestressed with >^-in strands conforming to ASTM A 416 as shown in Fig. 2. Curbs are provided by 6- by 12 -in timbers held in place with ^-in bolts 18 in long.
No double bents were used in the bridge.
Both the cast-in-place caps and the columns were designed using /'o=: 3,500 psi. The indicated average 28-day concrete cylinder strength for the columns ranged from 4,900 to 6,300 psi. All the reinforced concrete columns were spliced at about the ground line. The reinforcing above the ground consists of eight No. 8 bars with a No. 4 spiral pitched at 2J^ in. Below the ground the reinforcing consists of eight No. 10 bars with No. 4 spiral at 6 in. All reinforcement conforms to ASTM A 305.
The design live load was Cooper E 65 and 33 percent impact. The impact equation used was:
7 = 35 ~
500
as suggested in AREA Proceedings, Vol. 67, page 400.
The design assumptions used for longitudinal force resulting from the starting and stopping of trains were based on:
a. Force due to braking: One half of 15 percent of the live load without impact on only 6 spans or 198 ft of trestle and longitudinal force transmitted to 7 bents.
b. Force due to traction: One half of 25 percent of the weight on the driving wheels, without impact, transmitted equally to 2 bents.
Five-inch SR-4 strain gages were appUed 20 ft 6 in below the caps, or about 6 in above ground line on the center columns of alternate bents, as shown on Fig. 1 and on test bents 8, 9 and 10 as shown on the same figure. All gages were placed on the north and south faces of the columns. Gages were also placed on the bottom, 1 ft 6 in south of the center of the beams of span 9.
The rail on the bridge was Colorado Sec. 903, 1915, OH, laid in 33-ft lengths with four-bolt angle bars. Since the rail joints on this bridge were staggered approximately one-half rail length it was necessary, before the test began, to provide squared joints at each abutment by sawing the rail opposite two existing joints and installing angle bars and bolts. The rail gages were placed approximately 2 ft beyond these squared joints, as shown (see Fig. 1). The 1-in SR-4 gages were placed on the neutral axis to record longi- tudinal, axial strains. The saw cuts left rail gaps of only about Y^ in and it was neces- sary to open these to about J^ in with a joint spreader. The two existing joints were also spread to a gap of % in.
All joint-bar bolts on the bridge (and those in the squared joints) were individually checked by railroad section men before the test began to make certain all were tight. For those runs conducted with loose joints, only the squared joints were loosened (the others on the bridge were left tight). The joints were disassembled and the angle bars and rail surfaces were cleaned. The fishing surfaces were greased and the joints reas- sembled. The bolts were tightened only enough to keep the angle bars in p>osition and the rails in line.
Longitudinal Forces in a Concrete Trestle 4J^
To measure the longitudinal movement of bent 8, a linear extensometer was used. The fixed end was fastened to a timber trestle immediately adjacent to the concrete trestle and the other end was connected to the concrete cap.
The response from all the strain gages was ampliiied and recorded by two 12- channel oscillographs on photographic paper. A detailed description of the o.scillographs and their auxiliary units is given in the AREA Proceedings, Vol. 46, page 201, 1945, and a description of the SR-4 wire resistance strain gages with the necessary equipment is given in the Proceedings, Vol. 52, page 152, 1951.
D. TEST TRAIN
The test train consisted of two 4-axle diesel locomotives and four loaded hopper cars. It had a total length of 277 ft 10 in and a total weight of 1,269.6 kips. One loco- motive had axle loads of 62.4 kips and the other, 61.9 kips. The axle loads of the cars ranged from 47.2 to 50.1 kips. It was assumed that the total locomotive and car weights were distributed equally to each axle. The axle loads and spacings are shown in Table 1.
The Cooper equivalent of the two-unit locomotive in bending on the test span is E 32.3 and for the cars (cars 1 and 2 combined), E 42.9.
E. TEST RESULTS
The bents and span were instrumented as shown on Fig. 1. The investigation was conducted in several series because of the various studies involved and the limitations of the recording equipment. These series were Braking, Traction and Normal Running of the test train over the bridge. In general, each series was conducted as follows:
Braking — (a) Braking to a stop at various positions on the bridge; (b) braking across the bridge and stopping beyond it.
Traction — Starting from various positions on the bridge and accelerating off the bridge.
Each of the above was conducted with: (a) Tight rail joints at each abutment; (b) Loosened joints at each abutment.
Simultaneous recordings were obtained to determine: (a) Bending strains at ground line in bents throughout length of bridge; (b) vertical distribution of bending strains in a single column; (c) bending strains in columns and axial strains in the rails at the abutments.
Normal Running — (a) Constant speed, static runs (5 mph or less) across the test span; (b) constant speed, dynamic runs, at various speeds to 30 mph across the test span.
The above runs were made to determine: (a) Flexural strains in the beams; (b) compressive strains in the columns of the two supporting bents.
1. Typical Oscillograms for Braking and Traction
The data were recorded on oscillograms and typical traces are presented for:
(a) Braking to a stop on the bridge with tight rail joints. Fig. 4.
(b) Braking to a stop on the bridge with loosened rail joints at the abutments, Fig. 5.
(c) Traction or starting from a stopped position on the bridge with tight rail joints. Fig. 6.
(d) Traction with loosened rail joints. Fig. 7.
42 Longitudinal Forces in a Concrete Trestle
On Fig. 4 are shown the elevation of the bridge and symbols for SR-4 strain gages located near the ground line on bents 2, 4, 6, 8, 12, 14, 16 and 18. A light trace activated by a wheel trip is shown below the Elevation. The position of this wheel trip was on the center line of bent 13. Offsets to this trace indicated that 8 wheels passed over the trip before the train stopped. Below this are shown 15 traces responding to SR-4 gages. On the left hand side the bent number is shown corresponding to each of the traces.
Since the test train stopped at bent 10, the braking stress ahead of the train for bents 2, 4, 6 and 8 can be seen. For the other bents, however, the effect of the direct vertical stress is combined with the braking stress, and the latter was determined by reading the peak value and the value for direct stress. Also shown is the position of the first axle of the train when the brakes were applied as well as the position where vertical load began for each bent. For this run, the greatest braking stress of 273 psi occurred at bent 12 where a compression stress of 288 psi and a tensile stress of 258 were recorded.
On Fig. 5 are shown data similar to Fig. 4 except that the rail joints were loosened at the abutments. For this run, No. 24, the greatest braking stress occurred at bent 14, where a compression stress of 327 psi and a tensile stress of 278 psi were recorded.
After the train stopped the entire structure rebounded and vibrated longitudinally at a frequency of about 2.8 cps, as shown by the traces to the left of the point at which maximum braking stress occurred.
The oscillogram traces showing the effect of traction forces on the bridge are much less definitive than those for braking. Whereas the traces under braking attained a peak value at the instant of stopping, no such definite peak was apparent on the traces during traction runs. Every effort was made to develop a "hard start" by applying full power with the brakes set and then releasing them, but the transmission of power to the rails was not sudden (as in the case of braking) but gradual, and the maximum effect on the structure was not noted until the train had moved forward some distance. It was neces- sary, therefore, in determining the traction stresses, to compare the oscillogram traces under a normal slow-speed run of the train with a run under full traction. Fig. 6 shows such a comparison. The traces are shown in pairs: 1, 1-S; 2, 2-S; etc. The 1 trace repre- sents stress during traction, and the 1-S trace is for a regular slow-speed run. Com- paring the two traces and reading the maximum differences furnished the data for traction bending stresses.
Also on Fig. 6 are shown the elevation of the bridge and the initial starting posi- tion, as well as the position where maximum traction was read. At the left-hand side are the bent and trace position of the gages. The largest traction effect is shown for bent 8 where trace 6 indicates a tension stress of 117 psi and trace 7 a compressive stress of 158 psi for an average bending stress of 138 psi. This occurred during the condition of tight rail joints.
Fig. 7 shows typical traces with loosened joints, and is similar to Fig. 6. Under this condition for bent 8, traces 7 and 8, respectively, show a tensile stress of 124 psi and a compressive stress of 132 psi for an average bending stress of 128 psi.
2. Braking to a Stop on the Bridge
A total of 19 runs in which the test train came to a stop on the bridge was made and the results appear on Figs. 8 to 14, incl. Nine of the runs were recorded when the rail joints were tight and the others when the rail joints were loosened.
Each figure shows the elevation of the bridge and the stopped position of the test train for that particular run. The ordinate lines denote bent position, while the open
Longitudinal Forces in a Concrete Trestle 4^
circles denote the magnitude of the bending stress in psi for the bent. The exlremc right- and left-hand ordinates show the recorded axial force in the rails and these are plotted as closed circles showing the corresponding rail stresses in psi.
It can be seen that the curve described by the plotted points of these figures is somewhat parabolic in shape. The maximum values are shown to be under the train in its stopped position, with lower values toward the ends of the bridge. It should be noted, however, that the entire bridge is affected by the applied longitudinal force and that unloaded bents as well as those which receive vertical loads from the train are con- tributing to the resistance to this force. Furthermore, for the condition with tight rail joints, the rails at each end of the bridge resist longitudinal force regardless of where the train stopped on the bridge. It is apparent that higher bent stress occurred when the rail joints were loosened than when they were tight.
The maximum bending stress with the rail joints tight occurred during run 14 which appears in the middle chart on Fig. 8; its value is 280 psi. During run 24, with loose rail joints, the train stopped at nearly the same location and the maximum bend- ing stress was 295 psi. In general, all of the recorded values for this run are significantly higher than for run 14, due to loosened rail joints at the ends of the bridge.
The effect on rail stress of loosening the rail joints is apparent by comparing the recorded rail stress of Figs. 8, 9 and 10 with those on Figs. 11, 12, 13 and 14. At the south end of the bridge with tight joints the recorded stresses varied from 640 to a max- imum of 1,700 psi. After these joints were loosened the stresses varied from zero to a maximum of only 300 psi. At the north end of the bridge, there was a similar reduction. In the case of tight joints the recorded stresses varied from 130 to a maximum of 2,420 psi., and after loosening the variation was 220 to a maximum of 650 psi. It is apparent that the joints at the north end of the bridge were not completely unrestrained with respect to their ability to carry axial forces. The recorded values shown are the average of both rails, but the east rail (which had the sawed rail) still carried some force, whereas the west rail (which had the original joint) carried none. The southward move- ment of the bridge under braking force opened the joints at the north end and closed them at the south end. Apparently, this movement was more than the north joints on the east rail could accommodate and the holes in the rail came into bearing with the bolts. There may also have been some frictional resistance through the angle bars. Obvi- ously, there was some apprehension about operating with loose joints and it was, of course, important to maintain safe conditions, particularly since the north approach was on a curve that ended at the loosened joints. Thus, these joints in their loosened condi- tion were probably tighter than those at the south end.
On Table 2 are shown the recorded braking strains converted to force in kips. On the left hand side of the table are the individual bent numbers with the run numbers across the top. The table is separated into "Tight Joint Bars" and "Loosened Joint Bars."
The bent forces in Table 2 were derived from the recorded and interpolated values by assuming that the horizontal braking force due to stopping on the bridge acted at the top of the bent and that the bent was a cantilever fixed below the ground line. The section modulus, S, for one column at the lower gage location is 1,786 inl Using the recorded stress, free, at this gage location, the horizontal force, F, applied at a distance, d, from the gage location, was then determined as follows:
P __ 3iJ free.
d
44 Longitudinal Forces in a Concrete Trestle
It should be noted that the recorded values are actually strains and to convert them to stresses an assumption regarding the concrete modulus of elasticity was made. For an assumed concrete modulus of 5,000,000 psi the force conversion factor is:
F _ 3 X 1,786 X 5,000,000 XIO^^ _ 101.4 e
264
where e is the recorded strain in microinches per inch. For the case of a concrete modulus of 4,000,000 psi the braking force conversion factor is:
F = 81.2e
Values shown in Table 2 are given for two moduli because of the range of the strength of the concrete used in these columns. Maximum bent forces occurred during runs 14 and 24 and are shown to be 5.5 kips and 5.9 kips, respectively.
The rail forces in both rails at the north and south abutment were determined by adding the rail stresses together. For example, during run IS, the stress in each rail at the south end of the bridge was — 980 and — 1,000 psi. Since the area of the rail is 8.75 sq in and assuming this stress is spread over the total area, the total compressive force transmitted by the rails at the south end was (980 + 1,000) X 8.75 = 17,300 lb. At this same instant, tensile stresses induced in the rail at the north end of the bridge were + 1,680 and + 1,680 psi. The total tensile force transmitted by the rails at the north end was (1680+ 1680) X 8.75 = 29,400 lb. The total longitudinal force carried by the rails was, thus, 46,700 lbs or 46.7 kips for this particular run, and that is the value tabulated under run 15 in Table 2 for rail force.
To compare the values of Table 2 with respect to tight and loose joint bars, it is necessary to use runs where the stopped train positions were approximately the same. Such comparisons can be made using runs 14 and 24, 15 and 21, 12 and 25, 10 and 20. These are as follows:
Braking Force — Kips
|
Run Number |
To |
tal Bent |
Total Rail |
|
|
14 |
62.8 |
55.8 |
||
|
Tight 15 |
65.5 |
46.6 |
||
|
Rail Joints 12 |
58.1 |
36.8 |
||
|
10 |
52.2 |
37.6 |
||
|
Average |
59.6 |
44.2 |
||
|
Run Number |
Total Bent |
Total Rail |
||
|
24 |
76.4 |
10.8 |
||
|
Loosened 21 |
73.9 |
7.8 |
||
|
Rail Joints 25 |
65.8 |
6.0 |
||
|
20 |
Ave |
rage |
51.0 66.8 |
9.8 8.4 |
From the above, it can be seen that the effect of loosening the rail joints was to increase the load to the bents by a total of 7.2 kips. Since the reduction in load to the rails was 35.8 kips, it seems reasonable to assume that the balance of the load, or about 28 kips, went directly to the abutments.
Table 2 also shows values of longitudinal force calculated from recorded accelera- tions. These were derived from the relationship, F ,= nm. The mass, m, is known from the scale weights furnished for the entire train. The acceleration, a, was taken from the oscillograms. As explained earlier, each wheel in passing over a wheel trip on the rail marked the record in the form of an offset to a trace. Since the oscillogram also has
Longitudinal Forces in a Concrete Trestle 45
timinji lines and the distance between wheels is known it is possible to calculate the velocity of the train at various instances. The rate of change of the velocity between two points is the average acceleration between those points. At the instant the train stopped, the velocity is zero, so the acceleration just before stopping can be determined and this was used to calculate the longitudinal forces shown in Table 2. These forces are the greatest that could be determined from the oscillograms, but may not be the absolute maximum.
From Table 2 it can be seen that the longitudinal force calculated from recorded accelerations exceeds the sum of the bent forces and the rail forces, indicating that the abutment backwall also shares in the resistance to the longitudinal force. Furthermore, it should be noted that the maximum calculated longitudinal force of 158 kips is about 12 percent of the total train weight. With tight rail joints the percentage range of total longitudinal braking force resisted by the bents was 41 to 56 percent, by the rails 20 to 46 percent and by the backwalls apparently S to 30 percent.
The longitudinal movement of the cap on bent 8 was measured during 20 runs of braking to a stop on the bridge. These values are shown in Table 4, and it can be seen that the maximum movement with the rail joints tight was 0.212 in and with the rail joints loosened, 0.231 in.
3. Vertical Distribution of Braking Stresses in Columns
A series of 23 runs of the test train comprises this study. The effect of braking to a stop at or near two bents instrumented with SR-4 strain gages near the top, the third points and near the ground line was measured and the individual run data are plotted on Figs. 15 to 25. Figs. 15, 16 and 17 indicate the results for bent 8 when the rail joints were tight; and Figs. 18 and 19 show the effect when the rail joints were loosened. Figs. 20 and 21 indicate the results for bent 10 with tight rail joints, while Figs. 22 through 24 indicate the results with loosened rail joints. Fig. 25 shows the results during two runs when the test train made emergency stops.
As can be seen in each of the figures, there was an increase in recorded stress from the cap to the ground line, and the general shape of the stress curve represents the moment curve of a cantilever beam. (This observation has been reported in previous ER reports*.) It can be seen that there is no point of contraflexure above the ground, and that the bents are free to rotate at their tops but are fixed below the ground line. Two sets of values are shown for the stress at the ground-line gages. The open circles are the actual recorded values. The vertical column bars were lap-spliced at this location and the moment of inertia is about 10 percent greater here than for the balance of the column. The open squares, then, indicate the stress that probably would have been recorded had the columns not been spliced.
If no forces other than the longitudinal force acted on this column above the ground line, it would be expected that the plot of recorded stress at the various levels would describe a straight line. It is apparent, however, that they do not and that there must be some resisting moment at the top of the column. This could be developed by the weight of the deck preventing complete freedom of rotation.
It is interesting to note that at the lower gages the magnitude of stress in each of the columns comprising bent 8 are approximately equal, indicating that the individual columns in the bent resist the longitudinal forces together.
* ER-61, Field Investigation of Prestre.ssed Concrete Beams and Piles on the Western Pacihc Railroad, September 1965: and ER-48, Field Investigation of Two Concrete Bridges on Seaboard Air Line Railroad, .\ugust 1964.
46 Longitudinal Forces in a Concrete Trestle
4. Maximum Recorded Direct and Bending Stresses in Columns During Braking Across and Stopping Beyond the Bridge
In addition to braking to a stop on the bridge, several runs of the test train were made while crossing the bridge with the brakes applied. This information is plotted on Figs. 26 and 27 as open squares for the locomotive and as closed squares for the cars. A few runs were also made as normal runs without any brake application. These data are plotted with open and closed circles.
It can be seen from Fig. 26 that the maximum direct stress in the columns was not appreciably affected by braking across the bridge and that the stresses under braking and normal running were approximately the same in the various bents. The greatest stress was recorded in bent 14 and was 235 psi.; however, the majority of all values was about ISO psi.
Fig. 27 shows that the maximum bending stresses were highest during the braking runs. These bending stresses are the combination of bending due to eccentricity of the vertical loads and bending due to longitudinal force. It can be seen that the combined bending stresses are about twice the normal bending and that for these runs the column bending stresses (at the ground line) are approximately equal for vertical loads and longitudinal loads. The maximum recorded bending stresses occurred on bent 12 and were 135 psi under cars and 142 psi under locomotives.
5. Starting On the Bridge and Accelerating Off the Bridge
A total of seventeen runs which started from a stopped position at different loco- tions on the bridge was made; the data for tight rail joints appear in Figs. 28 and 29 and for loosened joints the information is in Figs. 30, 31 and 32. On each figure are an elevation of the bridge and the starting position of the train, as well as the position of .the train when maximum traction stresses were recorded for that particular run. The vertical lines denote bent position, while the open circles denote the traction stresses in psi for the bent. At the extreme right and left are the rail stresses indicated by closed circles.
The traction forces, while applied opposite in direction to the braking forces, were transmitted to the structure in much the same manner. Maximum values are shown to be on those bents under the locomotive and decrease towards the ends of the bridge. Higher stresses are produced when the rail joints are loose but no stresses were as high as those under braking runs.
It can be noted on Fig. 28 that the positions of the train for traction readings made during runs 13 and 14 were nearly identical. This position is close to that for runs 23 and 24 on Fig. 30 where it can be seen that higher traction stresses occurred with loosened rail joints and, in general, when the test train was in the central portion in the span after accelerating about 65 ft. The maximum bending stress was 110 psi with light rail joints and 140 psi with loose joints.
On Table 3 are shown the traction values that were recorded at the ground line of the various bents and converted to force in kips at the top of the cap. The bent forces due to traction were calculated essentially in the same manner as previously outlined for braking, the difference being that the horizontal force due to starting from a stopped position is opposite in direction. On the right-hand side of the table are the individual bent numbers with the run numbers, for the column headings. As is the case for Table 2 for braking forces, Table 3 is divided into "Tight Joint Bars" and "Loosened Joint Bars." Although not every bent was instrumented, values for the other bents are inter- polated. For all the recorded readings, care was taken not to include any bending from
Longitudinal Forces in a Concrete Trestle 47
vertical loads. Maximum values are shown to be 2.5 kips with tight rail joints and 2.8 kips with loosened joints. The rail-force data were determined similarly, as presented in Table 2, except that tensile stressess occurred at the south end and compressive stresses occurred at the north end.
Comparing runs with similar train positions, the following is obtained:
Traction Force — Kips Run Number Total Bent Total Rail
|
14 20.3 |
19.4 |
|
Tight 11 13.1 |
11.2 |
|
Rail Joints 15 17.3 |
20.5 |
|
12 19.0 |
18.2 |
|
Average 17.4 |
17.3 |
|
Run Number Total Bent |
Total Rail |
|
23 24.5 |
4.4 |
|
Loosened 24 30.7 |
6.3 |
|
Rail Joints 16 19.8 |
7.0 |
|
21 27.1 |
4.9 |
|
.Average 25.5 |
5.6 |
From the above, it can be seen that by loosening the rail joints, the load to the bents was increased and to the rails correspondingly decreased. It is also apparent that the total load to the bents and to the rails under traction runs is considerably less than that under braking runs.
Table 3 also shows values of longitudinal forces calculated from recorded accelera- tions. These were derived in a similar manner as for the braking runs. The train posi- tion for the maximum acceleration was not as definite as for braking, and it was found that the maximum acceleration was developed at some distance from the starting point. It can be seen that this force also exceeds the sum of the bent forces and rail forces. The maximum longitudinal force resulting from traction of the locomotives was 76 kips, which was 15 percent of the weight on the drivers.
The longitudinal movement of the cap on bent 8 was measured during 16 runs of starting on the bridge and accelerating off. These values are shown in Table 4, and it can be seen that the maximum movement with the rail joints tight was 0.070 in and with the joints loosened, 0.107 in.
6. Vertical Distribution of Traction Stresses in Columns
A series of 19 runs of the test train was made to determine the distribution of trac- tion bending stress along the length of a column in bents 8 and 10. Gages were located near the cap, at the third points and near the ground line. The individual run data are plotted on Figs. 33 to 40 incl., for each of the two bents and for tight and loosened rail joints. The distances shown give the loca'ion of the test train when the maximum traction stresses were recorded for that run.
In general, the vertical distribution of stresses under traction runs is similar to that under braking, except that the bending is in the opposite direction. The magnitudes of the traction stresses are also less than for I) raking. The cantilever action of the bent is demonstrated as well as the equal distribution of stresses to each of the three columns in a bent. The maximum column bending stresses due to traction were 162 psi for run 47 (Fig. 33) when the rail joints were tight and 168 psi for run 35 (Fig. 39) when loosened. The corresponding bent forces to produce these stresses were 3.4 kips and 3.5 kips, respectively.
48 , Longitudinal Forces in a Concrete Trestle
7. Static Stresses in Prestressed Concrete Beams under Normal Running
In addition to the investigation on the columns under braking and traction, a series of runs was made to determine the flexural strains of span 9 for a range of speeds from S mph to a maximum of 30 mph. Gages were positioned 1 ft 6 in south of the center line of the span on the bottom of the beams, as shown in Fig. 1.
The recorded and calculated static strains are shown in Table 5. The recorded values shown are the averages for the two bottom gages on each beam for runs 10 mph and slower.
The calculated static strain is based on the assumptions that the axle loads of the test locomotive are concentrated, transversely distributed equally to each of the four beams. It was also assumed that the section was uncracked. The concrete 28-day strength was not available, but for conversion purposes in this report j'r was assumed to be 6,000 psi and Ec = 5,000,000 psi.
The stress factor or the ratio of the recorded strains to the calculated strains is shown in columns 7 through 9. It can be seen that the values are close to unity and therefore the correlation between the recorded and calculated values is good, with regard to the assumptions made. The stress factors ranged from 0.83 to 0.94.
The distribution of load to each beam as a percentage of the total load is shown in Fig. 41. It is apparent that the combination of the transverse post-tensioning rods and the shear keys is effective in the transverse distribution of the live load.
8. Maximum Recorded Strains in Prestressed Concrete Beams Under Normal Running (Without Braking or Traction)
The maximum flexural live-load-plus-impact strains recorded at the bottom of each beam are shown in Fig. 42. These values are the averages of the two bottom SR-4 gages of each beam.
|
Type of Loading Locomotive |
Strain micro injin 96 |
Stress psi 480 61 S |
Speed mph IS IS |
Remarks Beam 2 |
|
Car |
123 |
Beam 4 |
As can be seen, the maximum flexural tensile stress for the locomotive is 480 psi compared to the calculated stress of 500 psi plus an impact factor of ii percent or 665 psi.
Since the precompression of the bottom fibers was about 1,775 psi and the tensile stress of 615 psi represents a relief of the precompression, it is apparent that the stresses produced by the test train were not sufficient to overcome this precompression and develop a resultant tensile stress.
The recorded strains for the cars were higher than for the locomotive as would be expected, since the Cooper equivalent for the cars was 33 percent more than that for the locomotive. As shown on the charts of Fig. 42, the transverse distribution for the regular speed runs up to 30 mph for the test train indicated equal distribution to the beams.
9. Vertical Distribution of Recorded Static Direct and Bending Stresses in Columns Under Normal Running (Without Braking or Traction)
The individual static-run data showing vertical distribution of direct and bending stresses for bents 8 and 9 are shown in Figs. 43 and 44, respectively. On the left of each figure is shown the elevation of the bent, with symbols indicating the position of
Longitudinal Forces in a Concrete Trestle 49
the SR-4 strain gages. The plots show the individual static direct and bending stress for slow-speed runs, 10 mph and under. In general, the direct stresses for both the locomo- tive and the cars were the same over the length of the column. The majority were in the vicinity of 125 to 150 psi., although one value of 170 psi was recorded. It can be noted that higher bending stresses occurred at the top level of gages for bents 8 and o. This bending is the result of the eccentricity of the live-load reactions, or having one span on the bent loaded more than the other. Whereas, under the action of braking and traction, the maximum bending stresses occurred at the ground line, under vertical loads the maximum occurred near the cap. The maximum recorded bending stress was 131 psi.
10. Vertical Distribution of Maximum Direct and Bending Stresses in Columns Under Normal Running (Without Braking or Traction)
On Fig. 45 is plotted the vertical distribution of the direct stresses for a range of speeds from 5 to 30 mph which were recorded on bents 8 and 9. Generally, the distri- bution of direct stress was in the vicinity of 125 to 150 psi for each level of the column. Although on bent 8, 6 ft above the ground line, a high direct stress of 195 psi occurring under the car at a speed of 20 mph can be noted. M this same speed the locomotive developed 190 psi.
The vertical distribution along the center column at four levels of bents 8 and 9 for the bending stress is plotted on Fig. 46. In most cases, the solid circles denoting car bending stresses were higher than those stresses for locomotives, which are shown as open circles. In general, at the top level of the piles the greatest values of bending stresses occurred. As can be seen in the upper left-hand plot, a high stress of 140 psi for the cars and a stress of 95 psi for the locomotive can be noted. At the lower two levels (i.e., 6 ft above ground line and at ground line) the recorded values are less.
On Figs. 43 to 46, incl., it should be kept in mind that the column section at the ground-line gages due to the lapped reinforcement is greater than at the other sections, and the recorded stresses were about 10 percent less than if no splice had been made.
11. Comparison of Specified Longitudinal Forces with those Developed by the Test Train
The current AREA specifications for reinforced concrete trestles recommend a live load equivalent to Cooper E 72, and with respect to longitudinal force:
"The longitudinal force resulting from the stopping and starting of trains shall be either the force due to braking, equivalent to 15 percent of the total live load without impact; or the force due to traction, equivalent to 25 percent of the weight on the driving wheels on the span without impact, whichever is the greater.
"For trestles not exceeding 200 ft in length, having longitudinal continuity by fric- tional resistance and having no open rail joints, the entire longitudinal force may be considered carried to the embankments at the end of the trestle. For trestles exceeding 200 ft having continuity of members, no open rail joints and double bents, one-hall the specified longitudinal force shall be distributed to the bents in proportion to their relative stiffnesses."
This trestle does not qualify for the one-half reduction given above since no double bents were used in the 660-ft total length, and to comply with the specification the full longitudinal force should be applied.
The E 72 pier reaction for two 33 -ft spans is 335.6 kips. For braking, 15 percent of this reaction is 50.2 kips and should be applied at the top of the cap. The E 72 pier reaction for 4 drivers on the 2 spans is 310.0 kips and for traction, 25 percent of this reaction is 77,6 kips, also to be applied to the top of cap.
50 Longitudinal Forces in a Concrete Trestle
The Santa Fe engineers recognized that the full AREA longitudinal force would not be transmitted to these bents and for the design of this trestle used the following:
For braking: The E 65 live load on six spans, or 198 ft of trestle, would be effec- tive for a braking force. The longitudinal force would be one-half of 15 percent of this live load distributed equally to 7 bents. The total live load for 198 ft= 1,500 kips, and the braking force is 1500X3^X0.15 3=113 kips. This distributed to seven bents is 113/7:= 16.1 kii>s per bent.
For traction: The E 65 live load on each span would have four drivers effective for the tractive effort. The longitudinal force would be one-half of 25 percent of this live load distributed equally to the two supporting bents. The total live load per span = 260 kips, and the traction force is 260 X '5^ X 0.25 = 32.5 kips. This distributed to two bents is 32.5/2 = 16.3 kips per bent. Thus, the railroad design for bending of the columns was based on a force at the cap of 16.3 kips.
The maximum bent reaction of the test train is 158.5 kips. The calculated braking force to a bent is 0.15 X 158.5 = 23.8 kips.
With tight rail joints the maximum bent force corresponding to recorded stress was 5.5 kips and with loosened bars, 5.9 kips. These values are 23 percent and 25 percent, respectively, of the calculated force.
The maximum bent reaction of the test locomotive is 158.0 kips. The calculated traction force to a bent is 0.25 X 158.0=39.5 kips.
With tight rail joints the maximum bent force corresponding to recorded stresses was 3.4 kips and with loosened bars, 3.5 kips. These values are 9 percent of the calcu- lated force.
It is therefore apparent that the bent forces actually developed in this structure are even less than the railroad's assumptions and far less than the AREA specification recommendation.
F. CONCLUSIONS
On the basis of tests on this structure it may be concluded that:
1. The maximum longitudinal bent force measured was from braking and was 23 percent of the force computed on the basis of 15 percent of the test train bent reaction.
2. With tight rail joints the percentage range of total longitudinal braking force resisted by the bents was 41 to 56 percent, by the rails, 20 to 46 percent, and by the backwalls apparently was 5 to 30 percent.
3. That portion of the longitudinal braking force transmitted to the bent was resisted by all bents of the bridge, acting as cantilevers, including those which carried no vertical live load. The distribution of longitudinal force was not uniform throughout the length of the bridge, but was highest for bents under the test train and gradually decreased with increase in distance from the test train. Loosening the rail joints at the ends of the bridge increased the longi- tudinal force resisted by the bents.
4. The maximum longitudinal force resulting from braking was 158 kips, which was 12 percent of the weight of the train.
5. The maximum longitudinal force rsulting from traction of the locomotives was 76 kips, which was 15 percent of the weight on drivers.
6. Bending stresses were recorded in the columns due to eccentricity of the ver- tical loads. These stresses were lower than those resulting from longitudinal
Long itudinal Forces in a Concrete Trestle
51
forces. Also, bending stresses due to eccentricity were highest near the tops of the bents, while the stresses due to longitudinal forces were highest near the ground line.
7. For the test span, the arrangement of transverse tie rods and the shear keys used was effective in producing a very nearly uniform distribution of the live load to each of the box beams comprising the span.
8. For the test span, the ratio of recorded to calculated strains due to bending ranged from 0.83 to 0.94.
(The tables and figures referred to in this report begin on page 52)
T7;r^Tr;riT7rrF^^^iri^^
53
54
Longitudinal Forces in a Concrete TrestI
|
~5 |
CO o |
f- d |
? |
6 |
6 |
.1 d |
6 |
0 |
■r d |
6 |
O |
z |
0 |
t d |
d |
6 |
6 |
o d |
^ |
.J r- |
T |
01 Ml |
f |
•J. |
* |
||||||||||||
|
_ |
>« |
6 |
in |
* |
^ |
<<) |
M |
<> |
o |
_ |
M |
C |
>s |
e\ |
■♦ |
\- |
o |
♦ |
<• |
n |
|||||||||||||||||
|
"a |
?1 |
<-) |
o |
0 |
6 |
d |
d |
♦ |
d |
6 |
d |
6 |
d |
6 |
d |
d |
1 |
in |
<r |
01 |
f; |
||||||||||||||||
|
^ |
0 |
"t |
1-1 |
M |
m |
+ |
.(1 |
0 |
m |
-t |
0 |
M |
♦ |
i- |
ih |
u, |
■> |
00 |
iS |
o |
_ |
_ |
m |
„ |
|||||||||||||
|
-o |
- |
N |
fO |
in |
r^ |
h |
%* |
Ul |
» |
'^' |
OJ |
lO |
o |
ci |
rJ |
p |
|||||||||||||||||||||
|
IJ |
- |
N |
rj |
- |
- |
" |
o |
0 |
o |
0 |
o |
0 |
0 |
o |
0 |
0 |
■^ |
in |
|||||||||||||||||||
|
tt |
„ |
J |
3 |
03 |
.r> |
m |
'J- |
f- |
o |
o |
^ |
N |
in |
00 |
nl |
m |
in |
«) |
<n |
- |
o |
||||||||||||||||
|
a. |
U) |
— |
r |
ID |
m |
t~ |
-f |
•♦ |
o |
— |
fZ |
•(» |
« |
_ |
^ |
00 |
|||||||||||||||||||||
|
^ |
or |
- |
rj |
tJ |
(VJ |
'VJ |
(M |
<\i |
- |
- |
- |
- |
- |
- |
- |
o |
° |
o |
o |
o |
«1 |
"> |
'" |
iii |
(D |
||||||||||||
|
■£ |
M |
ut |
oa |
O |
o |
* |
<£ |
(\j |
^ |
<r |
01 |
— |
«i |
c |
o |
0 |
d |
O |
|||||||||||||||||||
|
— |
f~ |
Ul |
(~ |
s |
<u |
(J> |
J |
o |
^- |
f* |
vfi |
r*i |
N |
^ |
«• |
.f1 |
^ |
||||||||||||||||||||
|
(£ |
o |
.J |
0 |
- |
- |
- |
■^ |
<M |
<y |
rxj |
- |
- |
- |
- |
- |
° |
o |
° |
o |
o |
0 |
N |
« |
•u |
~ |
in |
|||||||||||
|
o |
ID |
.C |
J |
r- |
<e |
•^ |
-1 |
01 |
•*- |
n |
M |
<0 |
^ |
«l |
n |
n |
0) |
0 |
|||||||||||||||||||
|
Q |
^0 |
(\J |
■«■ |
^ |
h |
m |
(-1 |
- |
0> |
^0 |
in |
«■ |
^ |
* |
nj |
^ |
. |
ft^ |
0 |
||||||||||||||||||
|
4 z |
z |
o |
- |
- |
- |
- |
- |
- |
- |
~ |
■" |
■ |
o |
o |
o |
o |
o |
0 |
« |
° |
- |
T |
- |
'" |
V |
||||||||||||
|
„ |
„ |
in |
_ |
o |
o |
^; |
in |
00 |
0 |
in |
« |
f- |
<0 |
<^ |
In |
00 |
o |
in |
<n |
0 |
|||||||||||||||||
|
0 |
•^ |
kl |
o |
— |
AJ |
J |
'^. |
fn |
^ |
f*i |
r- |
fj |
<s |
1* |
0 |
t |
... |
N |
N |
||||||||||||||||||
|
z |
0 |
- |
- |
- |
- |
'" |
M |
r~t |
-M |
■^ |
- |
- |
- |
- |
0 |
0 |
o |
0 |
.0 |
'" |
|||||||||||||||||
|
<r. |
m |
^ |
t- |
_ |
sff |
a |
_ |
^ |
.n |
B) |
ffl |
00 |
d |
fn |
00 |
T |
ni |
0 |
.«- |
<r |
A |
o |
|||||||||||||||
|
t/) |
o |
« |
0 |
w |
(J> |
*? |
. |
in |
in |
nj |
o |
«■ |
• |
— |
r- |
S> |
|||||||||||||||||||||
|
o |
d |
— |
— |
— |
_; |
— |
(U |
t\J |
fVJ |
cvi |
~ |
— |
— |
— |
— |
— |
0 |
(1 |
'J |
f 1 |
^D |
lU |
lU |
||||||||||||||
|
§ k- ^ |
|||||||||||||||||||||||||||||||||||||
|
-e |
s |
o |
~ |
s |
M |
s |
it |
t- |
3 |
^ |
S |
? |
•*■ |
(Tl O |
s |
01 |
+ |
f- |
ec |
K |
j |
o |
°. |
* |
s« |
(J> O |
0 |
||||||||||
|
0 |
- |
- |
- |
- |
- |
«j |
cg |
<VJ |
rj |
" |
~ |
tsl |
<NJ |
- |
o |
o |
0 |
d |
rtl |
"' |
r- |
fj |
'" |
r- |
|||||||||||||
|
< |
m |
o |
M |
^ |
^0 |
r- |
m |
a, |
O |
(tl |
■n |
nj |
in |
<- |
<J1 |
o |
^ |
o |
0 |
||||||||||||||||||
|
(- |
fu |
d |
(i |
d |
!^ |
"! |
01 |
■r |
rj |
'• |
M |
<B |
"! |
_1 |
d |
d |
o |
o |
•» |
V |
s |
in |
£ |
+ |
s |
oJ |
|||||||||||
|
s |
|||||||||||||||||||||||||||||||||||||
|
„ |
T- |
o |
b. |
■* |
<t\ |
O |
in |
M |
o |
(0 |
r |
* |
in |
.0 |
ID |
^ |
0 |
„ |
in |
CJ |
O |
||||||||||||||||
|
III |
-ffl |
0 |
;;i |
'^ |
■♦ |
- |
o |
'^ |
+ |
6 |
0 |
^! |
d |
6 |
d |
d |
d |
6 |
* |
O |
l!2 |
!G |
= |
0 |
^ |
S |
|||||||||||
|
^ |
^ |
«> |
OD |
M |
u |
o |
w |
(0 |
00 |
oa |
IS |
* |
r- |
r- |
* |
r- |
_ |
0 |
|||||||||||||||||||
|
«> |
|||||||||||||||||||||||||||||||||||||
|
n |
- |
- |
- |
o |
<5 |
° |
° |
o |
o |
o |
o |
0 |
0 |
0 |
o |
d |
o |
- |
w |
<" |
" |
- |
<vl |
CO |
|||||||||||||
|
a: |
_ |
^ |
Ul |
J |
r^ |
S |
0 |
« |
-t |
;;; |
» |
•+ |
ij |
c? |
■«• |
^ |
^ |
o |
- |
■^ |
■T |
m |
0 |
*"; |
t- |
oi |
|||||||||||
|
u |
1- |
0 |
" |
o |
0 |
o |
0 |
- |
- |
- |
- |
- |
- |
- |
o |
a |
o |
o |
o |
- |
- |
- |
ivj |
||||||||||||||
|
^ |
'?, |
(U |
^ |
.0 |
J. |
-M |
In |
(D |
m |
m |
<M |
fJ |
o |
w^ |
^1 |
CO |
■♦ |
r- |
0 |
r1 |
-I |
0 |
|||||||||||||||
|
m |
+ |
— |
«" |
01 |
<r |
f«i |
(Jl |
r* |
m |
(*i |
o |
*r |
m |
nj |
~ |
(T) |
^ |
ifi |
ffl |
||||||||||||||||||
|
f^ |
V- |
" |
" |
o |
o |
- |
- |
M |
CJ |
- |
- |
- |
- |
- |
0 |
u |
in |
" |
|||||||||||||||||||
|
in |
■t- |
yC |
in |
M |
00 |
in |
J |
0 |
lO |
N |
<« |
^ |
oo |
Ul |
o |
(0 |
„ |
0 |
|||||||||||||||||||
|
tf |
rtt |
<»■ |
ID |
^ |
1/1 |
A |
N |
f 1 |
O |
in |
.u |
01 |
* |
_■ |
i/i |
||||||||||||||||||||||
|
1- |
o |
O |
o |
o |
O |
- |
-■ |
- |
- |
- |
- |
- |
- |
0 |
o |
0 |
o |
^ |
- |
.J |
'" |
- |
,U |
||||||||||||||
|
«- |
h- |
■«■ |
0 |
<T> |
'-I |
S |
j^ |
« |
* |
<n |
T |
^r |
s |
10 |
rJ |
0 |
w |
rj |
o |
^ |
nl |
<- |
o |
||||||||||||||
|
cvj |
<D |
•J) |
ttl |
0 |
o |
rj |
o |
flO |
00 |
o |
■«• |
p> |
« |
f- |
'»• |
.; |
141 |
||||||||||||||||||||
|
" |
- |
- |
"" |
- |
- |
- |
- |
- |
o |
o |
o |
o |
- |
- |
- |
o |
0 |
o |
' |
" |
■^ |
- |
'" |
-t |
|||||||||||||
|
rM |
•r |
o |
r- |
n1 |
(^ |
^ |
^ |
0 |
•«- |
IT |
'^ |
t- |
K1 |
(P |
■* |
<n |
in |
03 |
o |
« |
m |
«. |
0 |
||||||||||||||
|
in |
T |
^ |
(^ |
lO |
-J |
ro |
— |
l> |
CD |
in |
m |
J) |
t |
p |
r^ |
.« |
^ |
||||||||||||||||||||
|
0 |
- |
- |
- |
- |
- |
-- |
~ |
- |
'" |
" |
o |
o |
o |
O |
o |
d |
rj |
"' |
t- |
- |
|||||||||||||||||
|
<i / z / Z / |
♦ |
«- |
h |
* 00 |
n |
0 |
* |
in |
* |
r; |
* |
a; |
1 |
J |
J' |
\ |
-1 |
1 |
1 |
§ |
^^ |
1^ |
2 |
1 1 |
s. |
||||||||||||
|
/ z / 2 |
iri |
IC |
? |
s |
y |
^ |
» |
^t |
J |
-V |
1 |
||||||||||||||||||||||||||
|
. |
1 |
^ '^1 1 |
u |
u- |
< |
"- |
>- •"! 1 |
o |
u. |
< |
Longitudinal Forces in a Concrete Trestle
TABLE 4 AT&SF RY. BRIDGE 50.9 MOVEMENT OF BENT 8 IN INCHES
|
Run |
During Braking |
During Starting |
|
|
Number |
To A Stop |
From Stop |
|
|
13 |
0.097 |
0.065 |
|
|
14 |
0.141 |
0.070 |
|
|
15 |
0.156 |
0.069 |
|
|
39 |
0.166 |
0.038 |
|
|
Tight Rail Joints |
40 |
0.212 |
0.052 |
|
41 |
0.114 |
0.035 |
|
|
42 |
0.134 |
0.025 |
|
|
43 |
— |
0.029 |
|
|
46 |
0.199 |
0.059 |
|
|
16 |
0.016 |
0.012 |
|
|
17 |
0.044 |
— |
|
|
18 |
0.138 |
0.038 |
|
|
19 |
0.091 |
— |
|
|
31 |
0.146 |
0.023 |
|
|
Loosened Rail Joints |
32 33 |
0.118 0.231 |
0.018 0.074 |
|
34 |
0.220 |
0.064 |
|
|
35 |
0.174 |
0.107 |
|
|
36 |
0.177 |
— |
|
|
37 |
0.127 |
~ |
|
|
38 |
0.168 |
— |
56
Longitudinal Forces in a Concrete Trestle
bD
tn H
|
o i-H |
ID |
<x> |
1 |
||||||||
|
CO |
i-O |
CO |
Tt< |
to |
t^ |
t- |
|||||
|
o |
'o |
'o |
00 |
00 |
00 |
05 |
00 |
OO |
00 |
||
|
O |
u |
O |
|||||||||
|
"rt |
|||||||||||
|
<ji |
o |
>* |
«D |
||||||||
|
^ |
o |
o |
t> |
iM |
CO |
o |
o |
||||
|
^^ |
Q |
^^ |
,__4 |
en |
Ol |
00 |
OT |
en |
05 |
05 |
|
|
o |
1) |
o |
o |
• |
• |
• |
|||||
|
U |
K |
o |
O |
||||||||
|
o |
|||||||||||
|
CJ |
|||||||||||
|
00 |
C3 |
n |
cr> |
||||||||
|
00 |
00 |
pq |
O |
o |
o |
o |
|||||
|
_J |
cn |
_j |
_; |
00 |
00 |
<x> |
Oi |
OS |
05 |
05 |
|
|
o |
M |
o |
o |
• |
• |
• |
|||||
|
U |
CD |
O |
U |
||||||||
|
t~ |
M |
;d |
|||||||||
|
^ |
. |
fO |
CO |
-I* |
to |
to |
<x> |
in |
|||
|
,__, |
,__, |
■— ^ |
00 |
00 |
00 |
00 |
00 |
00 |
00 |
||
|
d |
5 |
O O |
o |
• |
• |
■ |
|||||
|
a |
-o |
||||||||||
|
CO |
!£) |
S |
|||||||||
|
1 o |
"o |
o o rH |
|||||||||
|
X |
U |
"rt |
|||||||||
|
d |
o |
||||||||||
|
"5 |
|||||||||||
|
S |
|||||||||||
|
0) |
|||||||||||
|
be |
ira |
g |
|||||||||
|
c3 o |
• |
c2i |
CO |
in |
CO |
■* |
to |
t- |
t~ |
||
|
oo |
00 |
00 |
02 |
00 |
00 |
00 |
|||||
|
S |
|||||||||||
|
o |
|||||||||||
|
o |
|||||||||||
|
m |
-* |
e |
|||||||||
|
1" |
o |
o |
c~ |
?J |
CO |
o |
o |
||||
|
'— ' |
OS |
Oi |
00 |
en |
<Si |
Si |
05 |
||||
|
5 |
■a 0) |
||||||||||
|
-o |
|||||||||||
|
o |
|||||||||||
|
o |
|||||||||||
|
CO |
0) |
s |
|||||||||
|
00 |
00 |
(N |
o |
o |
o |
o |
|||||
|
O |
1" |
00 |
00 |
p^ |
05 |
05 |
a> |
05 |
|||
|
C<l |
§ |
||||||||||
|
^ |
s -^ |
CO |
CO |
>* |
to |
to |
to |
in |
|||
|
6 |
f25 |
00 |
00 |
00 |
00 |
00 |
00 |
00 |
|||
|
r-< |
0) bC |
||||||||||
|
(—1 |
CS |
||||||||||
|
o |
Tf |
in |
o |
I> |
in |
CO |
^ |
||||
|
O |
ira |
in |
lO |
lO |
in |
CO |
> < |
Longitudinal Forces in a Concrete Trestle
0
0
s.
J «a.
0,
^ u. -I
-— O tX
(/I n: "J
U I- ^
tS D Z
cO 5l u
Q —
5q
a CM.
^- ^
O LU
U) -J
-k
•i
Longitudinal Forces in a Concrete Trestle
Longitudinal Forces in a Concrete Trestle
59
FIG. 3 AT. & &F. bridge: 50.9
BENT DETAILS
END BENT
INTERIOR BENT
EACH BENT SYM.
ABOUT (t r-1
~:>^
J -^1 a'
•-L
?-8 |6
y^rTT^
1 t
3 6 SP. e r-o ...n.iio . 6SPei'-0 ,6
TIL
u
3j r-C I'-Ol 2
C 6SR e I'-O 10^3
n~ ■c
--^J3£^
^^i^^s^s:
rr
ft
Jr^i
a GJ \^j
t-7 5-0
-5:0 \,t-T^
BNO 10 VERTCAUS IN ABUTMENTS
■ ALL SPIRALS TO HAVE li EXTRA TURNS TOP & BOTTOM
I6"0.D.
8 NQ a VERTICALS - NQ4 e6" SPIRAL, 18'O.D.
GROUKJD
CONSTRUCTION' JOINT
e NO. 10 VERTICALS '
Nzi:
T"^"
Df?lLLCD BELOW_ GROUMD --^''
^r9\
60
Longitudinal Forces in a Concrete Trestle
Longitudinal Forces in a Concrete Trestle
61
Longitudi n al Forces in a Concrete Trestle
OO
|
111 |
|
|
Oq <0 |
|
|
o |
5z - - |
|
7 |
cc^ |
|
I- |
|
|
\- |
|
|
2 Si |
^o |
|
UJZ |
|
|
tf) |
Longitudinal Force s in a Concrete Trestle
63
(00:1 O01-; au.
64
Longitudinal Forces in a Concrete Trestle
9 CO
(C a LlI
or
=-§!£
CaUMN STRESSES - PSI
COLUMN STRESSES - PSI
-^
COL. STRESSE5-PSI
RAIL STRESSES - PSI
RAIL STRESSES - PSI
RAIL 5TRE55E5-P5I
Longitudinal Forces in a Concrete Trestle
65
mt-
=-^
H*
COLUMN STRESSES - PSI
RAIL STRESSES - PSI
RAIL STRESSES - PSI
RAIL STRESSES -PSI
Bui. 601
66
Longitudinal Forces in a Concrete Trestle
_^5
COLUMN STRESSES - PS I
Li-
O 5 § 8 g
2 y I"
COLUMN STRESSES - PSI
COL. 5TRESSES-P5I
RAIL STRESSES - PSI
RAIL STRESSES -PSI
" 8 § 8
2 (^ CO
RAIL STRESSES -PSI
Lo n gitudinal Forces in a Concrete Trestle
67
RAIL STRESSES
RAIL STRESSES - PS I
RAIL STRESSES
68
Longitudinal Forces in a Concrete Trestle
;co'
-^
COLUMN STRESSES - PSI
RAIL STRESSES -PSI
RAIL STRESSES -PSI
RAIL STRESSES -PSi
L o n g i t u d inal Forces in a Concrete Trestle
69
|
o |
|
|
o |
|
|
CJ)_I |
|
|
^ ' |
|
|
(T) |
|
|
UJLiJ |
|
|
in |
a id |
|
' |
^CY |
|
U. |
^te |
|
-iiS) |
|
|
H 2 |
|
|
<bc: |
|
|
< |
|
|
oc |
|
|
00 |
-°^
COLUMN STRESSES - PSl
n
i
©--
COLUMN STRESSES - PSl
COL. STRESSES -PSl
RAIL STRESSES - PSl
RAIL STRESSES -PSl
RAIL STRESSES- PSl
70
Longitudi nal Forces in a Concrete Trestle
<J>
So
=^Q0
=2
Q
lO
|
-f_ — 1 1 1 1 |
|||
|
o^ |
|||
|
0 o " o S g o o S 2 COLUMN STRESSES - PSI 1 1 1,1 . ii, |
RAIL STRESSES - PSI
Long itudinal Forces in a Concrete Trestle
71
O
z
D Of
|
nn |
||||
|
t |
||||
|
(> |
o
<
h- I S2
00
O
- Z
z
I
I
UJ
CO
ff) CO
Q LJ
I— If) — -7
- a ^ CD :<
Cb
in u
h-
I/)
tl
< _J
o o
u.
o
o
C)
QO
<
g
1-
LlI >
i\
i ^ L
Longitudinal Forces in a Concrete Trestle
Z
o
-3
<
\- I O f- I
c/^
UJ CO
in q:
I-
ul (/) O O
5 z
CD ^
, <
u. q; 00 CO
5i
o
z o
I-
CO
<
g
i-
tjj >
T
1 I
'00 o
|
III |
oj |
|
|
J |
'^ |
|
|
->< |
- |
|
|
<T |
\y |
0 |
|
^i- |
2 |
|
|
1- |
-7 |
|
|
a> |
■~) |
|
|
a |
a: |
|
|
u |
||
|
u |
||
|
0 |
||
|
ijj |
||
|
(T) |
||
|
<r |
(»> |
|
|
1- |
* |
d |
|
m |
7 |
|
|
00 |
2 |
|
|
* |
i \ L
|
0 0 tO 0 |
if) a. 1 |
|
0 |
<x> |
|
0 0 |
UJ |
|
ct |
^ o 113
i \ \
-\ — ■ 0
6
Longitudinal Forces in a Concrete Trestle
73
o z
— o
o
-3
<
X
I-
-!>-
CO
U-l
CO
(5> CO
1- UJ m
>■ a. —
■^ ^ g 'J- c/;
o
|
!fl |
||
|
< |
||
|
I |
00 |
|
|
t- |
* |
|
|
o |
||
|
o |
o |
|
|
kO |
2 |
|
|
- |
7 |
|
|
LL |
't |
J |
|
o |
ro |
^ |
d ~ Z
in 3 m q:
|
o o |
0- |
|
o |
|
|
() |
|
|
Al |
|
|
U) |
|
|
n |
<f) |
|
o |
UJ |
|
nc |
|
|
\- |
|
|
lO |
D
CD
a: co
Q
<
g
I-
Ixl
>
|
7 |
<X) |
|
|
< |
> |
i\! |
|
t- |
||
|
W7 |
"o CO |
O Z |
|
^J, |
(O |
z 3 |
74
Longitudinal Forces in a Concrete Trestle
m
o
z
z
- D vo or
O
-3
|
O |
||
|
LJ |
||
|
Z |
||
|
u |
||
|
CO |
||
|
O |
||
|
o |
||
|
1 |
CD |
|
|
OO |
< |
|
|
UJ |
||
|
<D |
en in |
X |
|
o |
lU |
Z) |
|
iD |
fr |
<.) |
|
1- |
tp |
|
|
UJ |
U~l |
|
|
(D |
||
|
O |
e? |
u. n |
|
cc a |
:z |
|
|
" CO |
i<i |
1- |
|
^ ir |
< ex. |
|
|
ll go |
CD |
o |
|
t*3 |
2' |
z |
|
H |
5 |
|
|
< |
_5 |
ai |
|
_i |
_j |
|
|
O |
X |
|
|
u |
4 |
|
|
Ll |
||
|
o |
||
|
V |
q; |
|
|
o |
||
|
1- |
u. |
|
|
~) |
O |
|
|
CQ |
||
|
a: }- |
UJ u |
|
|
en |
<" |
|
|
Q |
||
|
J |
Q |
|
|
<T |
||
|
O |
* |
|
|
h- |
||
|
q: |
||
|
LU |
||
|
> |
o
2
o
z
in 2
CM ^
d
z
-- z
^8
|
i |
QP |
|
1 1 ! |
|
|
! 0 ; |
|
i |
1 t |
|
|
0 |
1 |
|
§ UJ
- or
I-
O IS)
\ ?
_.[ <; ^'
0
|
c |
i 1 |
\ |
|
|
\ |
Longitudinal Forces in a Concrete Trestle
75
|
O |
|||
|
^ |
|||
|
_l |
|||
|
<f |
|||
|
ti: |
|||
|
Q |
|||
|
UJ |
|||
|
:^ |
|||
|
Ld |
|||
|
(O |
|||
|
o |
|||
|
O |
|||
|
_J 1 |
fc |
||
|
t/> |
< |
||
|
u |
|||
|
UO |
|||
|
0^ |
to |
l- |
o |
|
6 |
liJ |
rr) |
|
|
uo |
a: |
o |
O |
|
K |
(D |
z |
|
|
to z |
LL O |
z |
|
|
- CD |
^ |
||
|
^ u.- |
< |
X 1- |
|
|
Ll to |
CD |
O |
|
|
<« |
^ |
-T |
|
|
!-■ |
2 |
||
|
< |
3 |
UJ |
OJ |
|
_J |
ro |
||
|
C7 |
|||
|
u |
< |
O Z |
|
|
u_ |
|||
|
o |
t;; |
'(M ^ |
|
|
-7 |
a |
— tr |
|
|
o |
|||
|
1- |
LL |
||
|
-) |
o |
||
|
CD |
|||
|
)- |
UJ u 2 |
00 |
|
|
to |
< |
CO |
|
|
n |
>- |
d |
|
|
Q |
* 2 |
||
|
_j |
- z |
||
|
< |
CD 3 |
||
|
o |
* |
f^ ct |
|
|
h- |
|||
|
Qi |
|||
|
LiJ |
|||
|
> |
- -] r ^ %
"T h \
|
o |
|
|
o |
ul |
|
a. |
|
|
f) |
|
|
O |
|
|
(\l |
|
|
u> |
|
|
o |
I/) |
|
a |
u |
|
cr |
|
|
h |
|
|
O |
K) |
I ^
I
|
— |
T f |
|
|
i j |
||
|
i |
76
Longitudinal Forces in a Concrete Trestle
CO
h-
^o5
|
c |
— ?- I |
||
|
(^ |
^ |
||
|
< |
> |
o
-J
< ct
I- I
h-
CO
u
CO 01 CO d LU
in cc
1-
LlI if)
o O a Z
'^ CD ^
^ ^ ^ U- c/) CD
O
u
o
d in 5
|
( |
|||
|
< |
1 |
||
|
c |
^ |
|
l- |
^ |
|
o |
|
|
o |
o |
|
to |
2 |
|
LO Z |
|
|
a O |
1/1 3 |
|
tvj cc |
|
^ |
?- |
|
|
^ |
) |
|
|
<? |
|
0 |
|
|
() |
»0 |
|
K> |
a |
|
o |
|
|
C) |
|
|
OJ |
CO |
|
O |
(/) |
|
O |
liJ |
|
a |
|
|
t- |
|
|
u |
0) |
|
^ |
|||
|
( |
c 1 |
1 |
|
|
( |
' |
o
I I
o
C)
i ^ \
Longitudinal Forces in a Concrete Trestle
77
I-
, z
03 P
|
I 1 |
1 |
|
< |
EK |
|
\ |
o
-~>
< cc
I-
6 ' I
^ I I I
UJ CO CO UJ
cc
I-
z <
■"5; <
8
o
z g
f-
CQ IX
f- cO
Q
< O
1- Ct UJ
>
-^ uJ
-V
|
2 < |
<4- |
|
n |
O |
|
Q |
* ^ |
|
- z |
|
|
* |
|
^ p |
|
|
r 1 |
|
|
o |
|
o |
|
|
o |
' |
|
to |
|
|
n |
eO |
|
o |
U |
|
CC |
|
|
1- |
|
|
u; |
|
c |
u |
||
|
S |
< |
) |
|
|
) |
1 r ■ p-i
I c>
J I 1-
\ \
0
>y.
r
78
Longitu d inal Forces in a Concrete Trestle
1^ o
"id z 00 ct
<
Q uJ
Ld CO O O
j j ~T
g
ij
CO
UJ CO
a> CO d UJ in tx
h- u cO
(J
CO >^
Ll q^ 00 CD
Hi < Zj
o
u
Ll.
o
O
|
I |
|
|
1- |
|
|
o |
tv) |
|
o |
o z |
|
a |
|
|
o |
fvj Ct |
|
X |
|
|
H |
|
|
QC |
|
|
O |
|
1 1 |
1 0 |
o-i 6 |
|
|
c |
P |
||
|
6 |
j |
D m
t—
CO
Q
<
O
h- q:
UJ
>
o
z
ID D
o
9
I
Longitudinal Forces in a Concrete Trestle
79
<
LlI
if)
o
O
t
en
U
IT) O) CO
d iJ-i
LJ <r,
!^ ^ ^ Li- ui CD
O
o
z
|
z |
O |
|
< |
2 |
|
1- |
* 2 |
|
CO D |
|
|
Q |
ic a |
|
(0 |
CL |
|
o |
|
|
(:> |
|
|
(\J |
^ |
|
p, |
lO |
|
o |
UJ |
|
a: |
O U5
—
in O
<
O
I-
CK UJ >
-I
80
Longitudinal Forces in a Concrete Trestle
CO
l- Z
o
-5
p
^
o
_J2 I I
Q
z
UJ CO
o o
O
2
"- Z
1 ^ I i__ L
U en
(J> CO
O LU
I-
UJ CO
|
n |
0 |
LL 0 |
|
|
^h |
(Y |
2 |
|
|
m |
i«i |
||
|
<: |
T |
||
|
1^) |
ir |
^ |
t- |
|
u. |
ui |
CQ |
0 |
|
h |
Z) |
Ul |
|
|
< |
0 |
||
|
0 |
4 |
||
|
ll |
|||
|
0 |
□; |
||
|
2. 0 |
LL |
||
|
LL 0 |
|||
|
CQ |
|||
|
LL) |
|||
|
q: |
u |
||
|
)- |
z |
||
|
C/O |
< |
||
|
Q |
n |
||
|
_J |
|||
|
< 0 |
* |
||
|
h- |
|||
|
ct |
|||
|
UJ |
|||
|
> |
o
z
^ z
o z
00 D
O ! 2
CO -J
I \ i t
|
0 |
— |
|
D |
in |
|
(0 |
a |
|
0 |
1 |
|
0 |
|
|
fO |
en |
|
10 |
|
|
H |
UJ |
|
a: |
|
|
1- |
|
|
u |
U) |
|
g |
|||
|
{ |
1 |
< |
r ? |
|
c ( |
1 ) |
|||
|
( |
p |
|||
|
^ |
rJ |
Longitudinal Forces in a Concrete Trestle
81
< O
>
\- z
o
->
u o
3
I
<o
en tn
m cc O (— I—
o ^ o > S 5 2 o •^ aa i Z
U. 00 CD Q.
■w- 2 LJ H ^ ^
o o
b. O
z o
I-
D CO
oa
f-
Q
|
< |
o z |
|
|
y- |
|
■^ |
|
u> |
OD |
") |
|
(f) |
cr |
|
|
LL |
||
|
11 |
||
|
O |
-V
6 ^
T
i
t
|
o |
|
|
9> |
|
|
o |
|
|
<) |
|
|
<\J |
|
|
o |
|
|
o |
|
|
CO |
|
|
o |
a |
|
(0 |
|
|
(0 |
|
|
o |
iiJ |
|
M |
or |
|
t- |
|
|
o |
CJ? |
82
Longitudinal F o r c e s in a Concrete Trestle
|
0} |
||
|
Z: |
||
|
CO |
||
|
z |
||
|
1 |
K |
|
|
3 |
||
|
-J |
||
|
o |
||
|
o |
||
|
Z; |
||
|
z |
||
|
in |
||
|
CO |
~ |
|
|
Ld |
||
|
(f) |
||
|
CO |
c |
|
|
LlJ |
.5 |
|
|
q: |
||
|
f- |
||
|
co O LiJ |
||
|
2 |
CM |
|
|
ff^ S |
||
|
8q |
||
|
.yg |
||
|
cv' Q Q. |
O |
|
|
O^ O |
||
|
[i-,V, |
||
|
u: cc |
01 |
|
|
in |
||
|
^ 2 |
||
|
51 |
■i |
|
|
<: |
||
|
X |
||
|
<; |
h- |
|
|
2 |
||
|
u. |
||
|
O |
^ |
^ |
|
," |
||
|
z |
||
|
o |
||
|
t- |
||
|
3 |
||
|
CD |
||
|
CC |
— ^ |
^ |
|
)— |
||
|
cn |
||
|
Q |
||
|
o o |
||
|
2 Z |
||
|
^ 5^ l5 CD |
-^ |
(\i |
|
2^^i |
||
|
03 CD ^ :«^ |
||
|
o oag |
^- |
|
|
2 2 OQ CD |
/ . |
|
|
^ |
||
|
' |
2 |
|
|
o o o q: o a |
F |
1- |
|
s |
B B |
|
|
|
CO |
i i •fc»-o • 8 o |
||
|
o 2 |
|||
|
Z |
|||
|
UJ CD |
1 |
|
.•^^ . |
|||
|
8, |
|||
|
d 2 |
'' |
||
|
1— 2 Ld CD |
1 1 i |
|
c |
B - 0 |
|||
|
Si |
||||
|
d |
• |
9 ° |
||
|
1- z u CD |
o < o < -J O -J o
|
8 |
3 |
|||
|
NO. 2 |
«3 0» |
|||
|
BENT |
||||
|
^ |
5 f |
? c |
? c |
3 C |
|
1 „ |
||||
|
~" IT " |
||||
|
s5 d |
; °* ° ! |
» |
||
|
z |
1 |
|
i |
||||
|
0 |
o • |
• |
||
|
^ |
||||
|
BENT f |
|
■ o |
■c o |
|||
|
g |
||||
|
0 •o |
• |
|||
|
BENT |
COLUMN DIRECT STRESSES -PSI
Longitudinal Forces in a Concrete Trestle
— S5
|
cf J |
oa o |
■ |
||
|
1 |
||||
|
CD d -7 |
• |
% • |
||
|
BENT |
|
iT |
||||
|
>J0. 18 |
1 J |
|||
|
BENT \ |
N. C
9 o
-%-
|
, aao CM |
° |
|
BFNT |
|
■ |
■ 5; |
||
|
(_ |
. |
H |
— • |
|
■^ |
1 |
||
|
1 '^ |
•c |
||
|
O |
|||
|
7 |
|||
|
\- |
i |
T |
|
|
Z 1 |
|||
|
UJ |
|||
|
03 |
|
! |
a ■ |
I .a |
|
1 d |
o |
*j ( |
|
BENT |
d o : u cc o ct I o < o <
-^^
|
3o |
||||
|
d 2 |
^ |
CMO |
||
|
BENJT |
|
0-. . |
-- -o- |
|||
|
<\1 |
• |
O CO |
||
|
Z u |
COLUMN BENDING STRESSES - PSI
L 0 n gi t u di n al Forces in a Concrete Trestle
|
z or |
|||
|
1 i |
|||
|
1 |
|||
|
« |
|||
|
O 0 S n n 0 ^ COL. -iTRESSES-PSl |
RAIL STRESSES-PSil
RAIL 5TRE55ES-P3I RAIL STRESSES-P5I RAIL 5TRES5ES-PSI
Lo n sri t u din a 1 Forces in a Concrete Trestle
»- Z
o
->
h- o
I
in
UJ
to
s; o
^J 02
- (Q I-
"".■^ ^. <
<o
o h
D
?J
cd hS
■1.-'
z
uj£
-•-r
-&-
o o 00 o o o
COL. 5TRE55E5-P5I
L5-
o o 0 o
in O in
COL. 3TRES5E5-P5I
2
3
RAIL STRE5SES-P5(
RAIL STRESSED -PSt
O o O C
o O If!
COL. 5TRE5SE5-P5 1
RAIL 5TRE5SES-P3I
86
L 0 n g i t u d i n alFo rces in a Concrete Trestle
-^S^
o 0 o o
1, n o ^
COL. 5TRE55E5-P5I
to
O 8 § ^
COL. 5TRE55E5-P51
C0L.5TRES5ES-P3I
O O S <
O 0 '.
COL. STRESSES-PSI
RML 'TRl 35E5-P5I
RAIL STRESSES -P^l RAIL 5TRESSE3-P5I RAIL STRESSES-PSI
L o n g i t udinal Forces in a Concrete Trestle
87
RAIL STRES5ES-PS\
RAIL 5TTRE:55e5-P5i R»^IL STRES-iES-PSI RAIL 5TRE^5e.S-P5l
Longitudinal Forces in a Concrete Trestle
(/>
^* (-
"^
C— «-
O 0 O
to 0 I
<:0L. 5TRE55ES-PSI
;o S Q 9
• X Q O
) t' o «
) ~ -
RAIL STRESSES -PSJ
COL. 5TRE55E5-P5I
?All-. STRESSES -PSI
Longitudinal Forces in a Concrete Trestle
89
■-§
\ I :
in
UJ
iD
(T) IT)
• Ld
S^
O
CO I-
y LL < U- 00 Q:
<i
o
o
|
0 |
|
|
2 |
|
|
UJ |
(Ti |
|
J |
^ |
|
X |
|
|
< |
O |
|
Z |
|
|
(- |
CM Z |
|
ui |
~ 3 |
|
! |
||||
|
' |
||||
|
L |
||||
|
1 |
t |
|
1 |
J |
|||
|
c |
) |
|||
^o
CO
6
2
00
Longitudinal Forces in a Concrete Trestle
o
: 2
- 3
LO Ct
1 !>
A
I
C i/^
IT) in UJ
U-i cc
m cr
Z
-- o
DC
<
Z
<<
X X
t-v-
oo
in lO
OO
I X OO
LU III
_j -I < <
I- ^
o: Of
OO
IJJ LU U O
<<
'£' ^
o o
o
■4-
b
z
ir> q:
_i ^
|
o |
|
|
o |
— |
|
M |
(/) |
|
a |
|
|
o |
(D |
|
o |
If) |
|
"" |
UJ |
|
oc |
|
|
\~ |
|
|
n |
\i> |
i t f
Longitudinal Forces in a Concrete Trestle
01
|
(O |
||
|
t- |
||
|
Z |
||
|
o |
||
|
~) |
||
|
_i |
||
|
< |
||
|
a. |
||
|
n |
||
|
ij |
||
|
z |
||
|
UJ |
||
|
if) |
||
|
o |
||
|
C) |
||
|
_J |
||
|
tn UJ in |
5 < |
|
|
in |
||
|
U.' |
I |
|
|
0) |
or |
H |
|
H |
■) |
|
|
C-) |
m |
f1 |
|
in |
iP |
|
|
UJ |
z |
|
|
O |
o |
11 |
|
r " |
H |
0 |
|
^ q: |
O |
|
|
oO |
or |
X h- |
|
u- CO |
n |
|
|
o5 |
^ J |
z |
|
H |
3 |
iij |
|
< |
H |
J |
|
u |
< |
|
|
u. |
||
|
o |
i- |
|
|
2 |
||
|
O |
LL |
|
|
h- |
||
|
U- O |
|
O |
|
|
i^ |
|
|
m |
z |
|
^ |
1 |
|
(\i |
cc |
|
1) |
|||
|
,. |
|||
|
" |
|||
|
T |
|
(51 |
|||
|
_ . " .. A |
|||
|
o |
t |
1 |
! |
|
z |
e |
|
T |
||
|
I i |
||
|
<!' 1 |
|
o |
|
|
(1 |
— |
|
(Si |
tr) |
|
Q- |
|
|
n |
1 |
|
n |
IT) |
|
— |
I/) |
|
LLI |
|
|
o: |
|
|
h- |
|
|
o |
c/; |
|
o |
|
|
<) |
|
|
r\l |
|
|
O |
|
|
o |
d b z
i
92
Longitudinal Forces in a Concrete Trestle
no
b
|
(i |
! |
- z <r) a:
f ?
(/)
O Q
CO 2
CO cO
4 4
oo
oo II
CkTD
oo
V to
LJJUJ -J -J
|
o |
<< |
|
O |
H 1- |
|
3 CD |
U-LL OQ |
rO
¥ 2 O D ~ a:
|
0 |
'( |
\ |
|
I ( |
1 1 |
|||
|
c |
> |
|||
|
( |
5 |
Ul LU < <
DO
(Tl
rO d
I
Longitudinal Forces in a Concrete Trestle
9.?
O
d
2
o
z
b z
O 3 (\j or
|
. i f |
||||
|
T |
i 1 t I
10
UJ
if) if) ui
o to
CO
|
o |
_/ |
|
o |
<r |
|
u |
|
|
o |
h |
|
2 |
|
|
o |
u. |
|
t- |
|
|
Z) CD |
0 |
|
QC |
iLl |
p *
CD
6
in D
|
. |
i |
||
|
rt> |
o |
||
|
( |
) |
|
< |
||||
|
< |
1 |
|||
|
__j |
1 |
|
O |
|
|
o |
|
|
CM |
lO |
|
a |
|
|
o |
1 |
|
o |
lO |
|
tf) |
|
|
111 |
|
|
cc |
|
|
\- |
|
|
u |
m |
|
o |
|
|
f) |
|
|
<M |
|
|
0 |
|
|
o |
|
\ |
||||
|
( |
> |
|||
|
( |
1 |
|||
|
l> — ■ — |
I
04
Longitudinal Forces in a Concrete Trestle
(Die
1% OO
au. OO
i i 2 9
LU
CD cO
o en in
CO D h- rO cc S^
- ^ Z
o
OO UJLU
OO
LULU ^?
IT. >£
DC
o ^^
Q:
Q
_J < U I- oc
LU
>
|
■ |
|||
|
(! |
( |
\ |
r """"-11 |
|
o |
|
|
(^ |
|
|
(VJ |
(D |
|
a |
|
|
O |
m |
|
o |
ui |
|
tu |
|
|
or |
|
|
h- |
|
|
(0 |
I
Longitudinal Forces in a Concrete Trestle
|
? |
||
|
c |
> I |
|
|
1 1 t |
ID
o o
Q
a
(£1
u: c/i oa
<
|
(J |
a 0 |
|
< |
|
|
a: |
r |
|
H |
k |
|
a |
|
|
Z |
O |
|
■? |
~z |
|
o |
III |
|
o |
|
|
L- |
-J |
|
O |
|
|
z |
|
|
o |
q; |
|
O |
|
|
a: |
|
|
N |
z |
|
in |
^ |
|
C\J |
QL |
96
Longitudinal Forces in a Concrete Trestle
fete
<4
XX OO
OO
6
^ 2
9 ?
cP
LU
Ul
<n ul
-^ o ul to
o I-
5 u
03 <
cc
u: t-
^8
OO
uJiil J_J
x>: <<
LLU. U.LL
OO
LULU ZZ
<< l-f-
5q
-V
|
— |
|||
|
I J |
|||
|
J |
i) ' |
l> |
1! |
o
"I ^
*^ UJ CO
Longitudinal Fore es in a Concrete Trestle
97
FIG. 41 AT&SF RY BRIDGE 50.9 TRANSVERSE DISTRIBUTION
Beam 2
Beam 3
Beam 4
Beam 1
l'-6 SOUTH OF CENTER LINE OF SPAN 9
|
25.6 |
25.6 |
24.7 |
|
|
24.1 |
PERCENT OF TOTAL LOAD TO BEAMS (Based on Average of Recorded Values for 6 Static Runs)
Kill. 601
98
Longitudinal Forces in a Concrete Trestle
* STRESS IN PSI
0)
z <
Q.
H
01 2 -
ej (D Q L^
[I^ mo
■^ Od
H U o
H
|
XI |
k^ |
|||||
|
/ |
•t < CO |
|||||
|
/ |
\ |
^ |
^A |
|||
|
!■" |
||||||
|
/ |
^ |
< |
||||
|
\ |
-^ |
^;^ 1 |
||||
|
/ |
~^ |
2 < UJ CD |
||||
|
\ |
_) |
r1— T |
||||
|
-— - |
n? |
|||||
|
rfi |
||||||
|
\ |
/ |
"^ |
<J— ^ |
|||
|
\ |
5 < UJ CD |
|||||
|
X |
r^^ |
— — \ — a
"' _j (J <] o •
|
i |
|||||
|
• • •• |
" o CO |
||||
|
BEAM 3 |
• |
coo |
|||
|
• • V |
0 So |
|
•• * * 1 • |
^ o \ 6> |
||||
|
BEAM 2 |
.. |
CO o |
|||
|
• •< |
o8 |
||||
|
•• •• |
0 o o o |
|||||
|
1 m |
r |
ocP |
||||
|
• |
o |
STRAIN W MICRONCHES
Lo n gi t u dinal Forces in a Concrete Trestle
9Q
03
I-
UJ CD
c/5
r
■1
|
q |
II |
|
|
i |
||
|
6 |
i |
|
|
i i t |
o
o
to
u
(Ji UJ
(/) u
a g "^ I-
="<
U.-H-
Li CO
o6
00
U-
< Z
g
h- D
CO
a I- co o
<
UJ
>
UoQ<..
|
D- |
|
4 -t " ;, |
|
°* 1 ! |
|
^ ^ |
|
o |
|
|
C) |
|
|
<M |
in |
|
Q. |
|
|
o |
1 |
|
o |
to |
|
~ |
(0 |
|
Ul |
|
|
oc |
|
|
o |
(- to |
|
o |
|
|
o |
|
|
(M |
|
|
o |
|
|
o |
100
Longitudinal Forces in a Concrete Trestle
I-
UJ CD
O
o
o
T
-^
01 CO
I-
6
S
i^i
00
q8 Ll
H ^
< 2 O
D
CD
Ct
f-
<
U
!-
q:
UJ
>
|
4 ! t |
i |
|
|
1 |
> |
|
|
1 |
^ |
|
CO a. |
|
|
O o |
1 |
|
UJ |
|
|
o |
a: h U7 |
|
o |
|
|
o o |
o
z
& CD
Longitudinal Forces in a Concrete Trestle
101
FIG. 45 AT. & 5.F BRIDGE 50.9 VERTICAL DISTRIBUTIOM OF MAXIMUM DIRECT STRESSES IM COLUMNS o LOCO, • CAR
200
150
100
50
^^
f-H
200
150
i/) 100 Q.
UJ 50 in
H 200 U
UJ
— Q
Z
3 100
150
50
-O 200
9 •
150
100
50
|
1 |
||
|
° '• « ? • cC OQ " I o °( • e • ' 1 |
\ |
|
|
<J t • ( |
1 <> o |
1 |
|
|
1 1 1 i |
||
|
o |
||
|
i 1 |
||
|
1 1 |
2 'T
|
i 1 J |
||
|
?!4 |
||
10 20 30 40 0 10 20 30 40
BENT 8 BENT 9
SPEED IN MPH
102
Longitudinal Forces in a Concrete Trestle
s
Wa
W^A
FIG 46 AT K 5.F. BRIDGE 50.9
VERTICAL DISTRIBUTION OF MAXIMUM BENDING STRESSES IM COLUMNS DUE TO ECCENTRICITY OF VERTICAL LOADS
zoo\
150
o LOCO. • CAR
100
50
• • * * .
^8 °p ^ :^" ^
O ZOO
z
Q
z
UJ 150- CD
Z
2
50
150
50
10 20
BENT 6
|
zoo |
||
|
LO 100 a ^ 50 tn in UJ IX |
||
|
^i |
• 5 O ♦ |
I |
|
1 |
|
|
1 : 1 ; ! ° i |
|
|
• a o ? • ' |
» |
|
•t.i : ; -^ . |
|||
|
Og oi oo 0 o° " |
|||
|
t> , |
1 M |
• |
|
|
°° o i % ^ § ' 1 1 |
|
i |
||
|
;• |
1 oo ,, |
! i i |
|
• |
0 |
• • |
1 |
|
• •< o °< oo ^ |
o $ • o < |
10 20 iO
BENT 9
■=10
SPEED IN MPH
Some Observations on Russian Railroad Practices*
By G. M. MAGEE
Director of Engineering Research, AAR
In the latter part of April of this year I had an opportunity to attend a United Nations ECAFE meeting for a period of two weeks in Russia as one member of a dele- gation of four to attend a Workshop-Cum-Study of diesel locomotive maintenance and operation practices of the Russian railroads. Other members of the delegation were W. M. Keller, vice president — research, AAR; P. V. Garin, assistant chief mechanical officer — engineering, Southern Pacific Company ; and S. G. Guins, assistant director of research, C&O-B&O Railway. Inasmuch as Mr. Guins speaks Russian fluently and under- stands the technology of railroading, he was a tremendous asset to our delegation.
ECAFE is the abbreviation for Economic Commission for Asia and the Far East and was established in March 1947 to "promote measures for the reconstruction and economic development of this region." It has been a practice to periodically hold Work- shops in various countries of the region where significant developments in railroad technology have been made.
The Russians had planned the Workshop to give the delegates not only an under- standing of various phases of Russian railroad practices but also an insight into Russian culture and other economic developments, such as collective farming. There were 13 countries represented at the Workshop with a total attendance of 44. ECAFE was officially represented by U. Nyun, executive secretary; M. S. Ahmad, chief, Transport and Communications Div-ision; and Akbar Khabiri, chief of the Railway Section.
I would first like to give you a general picture of the Russian railroad system and its organization following which I would like to describe our trip and show you some slides [none reproduced herein] which I hope will be of interest to you and give you a better idea of Russian railroading and Russian life.
As a background, it is important to recognize that there are two important differ- ences between conditions for railroading in Russia and the United States. First, the Soviet railways are state owned and operated like all other Soviet industry. Second- Russia does not have the relatively large number of automobiles and trucks nor the extensive network of good highways that we have in the United States. There is, there- fore, no competition between railway and other forms of transportation in Russia.
The Russian railroad system is headed by a Minister of Railroad Transportation with headquarters in Moscow. The system includes 81,800 route miles and is divided into 25 regions. The total staff directly connected with operations and maintenance is 1,900,000. The overall staff involved in railway and associated operations, including med- ical personnel, research institutes, railway training schools, etc., is 3,300,000. Each of the 25 regions has its own supervisory organization and operates as a separate unit except that it is under the overall direction of the Minister of Railroad Transportation. All railway personnel, including supervisory officers, are members of the Railway Labor Union and frequently the head of the railway in a given area may also be the head of that division of the Railway Labor Union.
The Soviets do not make available information on the total number of locomotives, freight and passenger cars in use. However, in 1965, 46 percent of the traffic handled was by diesel locomotives, 40 percent by electric and IS percent by steam. In 1959, 67 percent of the traffic was handled by steam, so it is apparent that substantial progress has been made in dieselization. The Soviet claim that in 1965, 1342 billion ton-miles of
* Address presented October 7, 1966, to the Second Regional Meeting, American Railway Engi- neering Railway Engineering Association, Robert Meyer